In the House of Representatives, U. S.,
May 8, 2024.
Resolved, That the bill from the Senate (S. 870) entitled “An Act to amend the Federal Fire Prevention and Control Act of 1974 to authorize appropriations for the United States Fire Administration and firefighter assistance grant programs.” , do pass with the following
AMENDMENTS:
This division may be cited as the “Fire Grants and Safety Act of 2023”.
SEC. 2. Reauthorization of the United States Fire Administration.
Section 17(g)(1) of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2216(g)(1)) is amended—
SEC. 3. Reauthorization of Assistance to Firefighters Grants Program and the Fire Prevention and Safety Grants Program.
(a) Sunset.—Section 33(r) of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2229(r)) is amended by striking “2024” and inserting “2030”.
(b) Authorization of appropriations.—Section 33(q)(1) of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2229(q)(1)) is amended by striking “to carry out this section—” and all that follows through “the fiscal year described in clause (i)” and inserting “to carry out this section $750,000,000 for each of fiscal years 2024 through 2028”.
SEC. 4. Reauthorization of Staffing for Adequate Fire and Emergency Response Grant Program.
(a) Sunset.—Section 34(k) of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2229a(k)) is amended by striking “2024” and inserting “2030”.
(b) Authorization of appropriations.—Section 34(j)(1) of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2229a(j)(1)(I)) is amended—
Not later than three years after the date of the enactment of this Act, the Comptroller General of the United States shall conduct an audit of and issue a publicly available report on—
(a) Short title.—This division may be cited as the “Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024” or the “ADVANCE Act of 2024”.
(b) Table of contents.—The table of contents for this division is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Definitions.
Sec. 101. International nuclear export and innovation activities.
Sec. 102. Denial of certain domestic licenses for national security purposes.
Sec. 103. Export license notification.
Sec. 104. Global nuclear energy assessment.
Sec. 105. Process for review and amendment of part 810 generally authorized destinations.
Sec. 201. Fees for advanced nuclear reactor application review.
Sec. 202. Advanced nuclear reactor prizes.
Sec. 203. Licensing considerations relating to use of nuclear energy for nonelectric applications.
Sec. 204. Enabling preparations for the demonstration of advanced nuclear reactors on Department of Energy sites or critical national security infrastructure sites.
Sec. 205. Fusion energy regulation.
Sec. 206. Regulatory issues for nuclear facilities at brownfield sites.
Sec. 207. Combined license review procedure.
Sec. 208. Regulatory requirements for micro-reactors.
Sec. 301. Foreign ownership.
Sec. 401. Report on advanced methods of manufacturing and construction for nuclear energy projects.
Sec. 402. Nuclear energy traineeship.
Sec. 403. Biennial report on the spent nuclear fuel and high-level radioactive waste inventory in the United States.
Sec. 404. Development, qualification, and licensing of advanced nuclear fuel concepts.
Sec. 501. Mission alignment.
Sec. 502. Strengthening the NRC workforce.
Sec. 503. Commission corporate support funding.
Sec. 504. Performance metrics and milestones.
Sec. 505. Nuclear licensing efficiency.
Sec. 506. Modernization of nuclear reactor environmental reviews.
Sec. 507. Improving oversight and inspection programs.
Sec. 601. Technical correction.
Sec. 602. Report on engagement with the Government of Canada with respect to nuclear waste issues in the Great Lakes Basin.
Sec. 603. Savings clause.
In this division:
(1) ACCIDENT TOLERANT FUEL.—The term “accident tolerant fuel” has the meaning given the term in section 107(a) of the Nuclear Energy Innovation and Modernization Act (Public Law 115–439; 132 Stat. 5577).
(2) ADMINISTRATOR.—The term “Administrator” means the Administrator of the Environmental Protection Agency.
(4) ADVANCED NUCLEAR REACTOR.—The term “advanced nuclear reactor” has the meaning given the term in section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439).
(5) ADVANCED NUCLEAR REACTOR FUEL.—The term “advanced nuclear reactor fuel” has the meaning given the term in section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439).
(8) INSTITUTION OF HIGHER EDUCATION.—The term “institution of higher education” has the meaning given the term in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)).
(9) NATIONAL LABORATORY.—The term “National Laboratory” has the meaning given the term in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801).
(a) Commission coordination.—
(1) IN GENERAL.—The Commission shall—
(B) support interagency and international coordination with respect to—
(i) the consideration of international technical standards to establish the licensing and regulatory basis to assist the design, construction, and operation of nuclear reactors and use of radioactive materials;
(b) Authority To establish branch.—The Commission may establish within the Office of International Programs a branch, to be known as the “International Nuclear Export and Innovation Branch”, to carry out the international nuclear export and innovation activities described in subsection (a) as the Commission determines to be appropriate and within the mission of the Commission.
(c) Exclusion of international activities from the fee base.—
(1) IN GENERAL.—Section 102 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215) is amended—
(a) Definition of covered fuel.—In this section, the term “covered fuel” means enriched uranium that is fabricated outside the United States into fuel assemblies for commercial nuclear power reactors by an entity that—
(b) Prohibition on unlicensed possession or ownership of covered fuel.—Unless specifically authorized by the Commission in a license issued under section 53 of the Atomic Energy Act of 1954 (42 U.S.C. 2073) and part 70 of title 10, Code of Federal Regulations (or successor regulations), no person subject to the jurisdiction of the Commission may possess or own covered fuel.
(c) License To possess or own covered fuel.—
(1) CONSULTATION REQUIRED PRIOR TO ISSUANCE.—The Commission shall not issue a license to possess or own covered fuel under section 53 of the Atomic Energy Act of 1954 (42 U.S.C. 2073) and part 70 of title 10, Code of Federal Regulations (or successor regulations), unless the Commission has first consulted with the Secretary of Energy and the Secretary of State before issuing the license.
(2) PROHIBITION ON ISSUANCE OF LICENSE.—
(A) IN GENERAL.—Subject to subparagraph (C), a license to possess or own covered fuel shall not be issued if the Secretary of Energy and the Secretary of State make the determination described in subparagraph (B)(i)(I).
(B) DETERMINATION.—
(i) IN GENERAL.—The determination referred to in subparagraph (A) is a determination that possession or ownership, as applicable, of covered fuel—
(ii) JOINT DETERMINATION.—A determination described in clause (i) shall be jointly made by the Secretary of Energy and the Secretary of State.
(iii) TIMELINE.—
(I) NOTICE OF APPLICATION.—Not later than 30 days after the date on which the Commission receives an application for a license to possess or own covered fuel, the Commission shall notify the Secretary of Energy and the Secretary of State of the application.
(II) DETERMINATION.—The Secretary of Energy and the Secretary of State shall have a period of 180 days, beginning on the date on which the Commission notifies the Secretary of Energy and the Secretary of State under subclause (I) of an application for a license to possess or own covered fuel, in which to make the determination described in clause (i).
(III) COMMISSION NOTIFICATION.—On making the determination described in clause (i), the Secretary of Energy and the Secretary of State shall immediately notify the Commission.
(IV) CONGRESSIONAL NOTIFICATION.—Not later than 30 days after the date on which the Secretary of Energy and the Secretary of State notify the Commission under subclause (III), the Commission shall notify the appropriate committees of Congress, the Committee on Foreign Relations of the Senate, the Committee on Energy and Natural Resources of the Senate, and the Committee on Foreign Affairs of the House of Representatives of the determination.
(a) Definition of low-Enriched uranium.—In this section, the term “low-enriched uranium” means uranium enriched to less than 20 percent of the uranium-235 isotope.
(b) Notification.—If the Commission, after consultation with the Secretary of State and any other relevant agencies, issues an export license for the transfer of any item described in subsection (d) to a country described in subsection (c), the Commission shall notify the appropriate committees of Congress, the Committee on Foreign Relations of the Senate, the Committee on Energy and Natural Resources of the Senate, and the Committee on Foreign Affairs of the House of Representatives.
(c) Countries described.—A country referred to in subsection (b) is a country that—
(1) has not concluded and ratified an Additional Protocol to its safeguards agreement with the International Atomic Energy Agency; or
(2) has not ratified or acceded to the amendment to the Convention on the Physical Protection of Nuclear Material, adopted at Vienna October 26, 1979, and opened for signature at New York March 3, 1980 (TIAS 11080), described in the information circular of the International Atomic Energy Agency numbered INFCIRC/274/Rev.1/Mod.1 and dated May 9, 2016 (TIAS 16–508).
(d) Items described.—An item referred to in subsection (b) includes—
(1) unirradiated nuclear fuel containing special nuclear material (as defined in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014)), excluding low-enriched uranium;
(a) Study required.—Not later than 1 year after the date of enactment of this Act, the Secretary of Energy, in consultation with the Secretary of State, the Secretary of Commerce, the Administrator of the Environmental Protection Agency, and the Commission, shall conduct a study on the global status of—
(b) Contents.—The study conducted under subsection (a) shall include—
(1) information on the status of the civilian nuclear energy industry, the long-term risks to that industry, and the bases for those risks;
(2) information on how the use of the civilian nuclear energy industry, relative to other types of energy industries, can reduce the emission of criteria pollutants and carbon dioxide;
(3) information on the role the United States civilian nuclear energy industry plays in United States foreign policy;
(4) information on the importance of the United States civilian nuclear energy industry to countries that are allied to the United States;
(5) information on how the United States may collaborate with those countries in developing, deploying, and investing in nuclear technology;
(6) information on how foreign countries use nuclear energy when crafting and implementing their own foreign policy, including such use by foreign countries that are strategic competitors;
(7) an evaluation of how nuclear nonproliferation and security efforts and nuclear energy safety are affected by the involvement of the United States in—
(8) an evaluation of how industries in the United States, other than the civilian nuclear energy industry, benefit from the generation of electricity by nuclear power plants;
(9) information on utilities and companies in the United States that are involved in the civilian nuclear energy supply chain, including, with respect to those utilities and companies—
(a) Identification and Evaluation of Factors.—Not later than 90 days after the date of enactment of this Act, the Secretary of Energy, with the concurrence of the Secretary of State, shall identify and evaluate factors, other than agreements for cooperation entered into in accordance with section 123 of the Atomic Energy Act of 1954 (42 U.S.C. 2153), that may be used to determine a country’s generally authorized destination status under part 810 of title 10, Code of Federal Regulations, and to list such country as a generally authorized destination in Appendix A to part 810 of title 10, Code of Federal Regulations.
(b) Process Update.—The Secretary of Energy shall review and, as appropriate, update the Department of Energy’s process for determining a country’s generally authorized destination status under part 810 of title 10, Code of Federal Regulations, and for listing such country as a generally authorized destination in Appendix A to part 810 of title 10, Code of Federal Regulations, taking into consideration and, as appropriate, incorporating factors identified and evaluated under subsection (a).
(c) Revisions to List.—Not later than one year after the date of enactment of this Act, and at least once every 5 years thereafter, the Secretary of Energy shall, in accordance with any process updated pursuant to this section, review the list in Appendix A to part 810 of title 10, Code of Federal Regulations, and amend such list as appropriate.
(a) Definitions.—Section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439) is amended—
(1) by redesignating paragraphs (2) through (15) as paragraphs (3), (6), (7), (8), (9), (10), (12), (15), (16), (17), (18), (19), (20), and (21), respectively;
(2) by inserting after paragraph (1) the following:
“(2) ADVANCED NUCLEAR REACTOR APPLICANT.—The term ‘advanced nuclear reactor applicant’ means an entity that has submitted to the Commission an application for a license for an advanced nuclear reactor under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.).”;
(3) by inserting after paragraph (3) (as so redesignated) the following:
“(4) ADVANCED NUCLEAR REACTOR PRE-APPLICANT.—The term ‘advanced nuclear reactor pre-applicant’ means an entity that has submitted to the Commission a licensing project plan for the purposes of submitting a future application for a license for an advanced nuclear reactor under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.).
(4) by inserting after paragraph (10) (as so redesignated) the following:
“(11) HOURLY RATE FOR MISSION-DIRECT PROGRAM SALARIES AND BENEFITS.—The term ‘hourly rate for mission-direct program salaries and benefits’ means the quotient obtained by dividing—
(5) by inserting after paragraph (12) (as so redesignated) the following:
“(13) MISSION-DIRECT PROGRAM SALARIES AND BENEFITS.—The term ‘mission-direct program salaries and benefits’ means the resources of the Commission that are allocated to the Nuclear Reactor Safety Program (as determined by the Commission) to perform core work activities committed to fulfilling the mission of the Commission, as described in the document of the Commission entitled ‘FY 2023 Final Fee Rule Work Papers’ (or a successor document).
(b) Excluded activities.—Section 102(b)(1)(B) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(b)(1)(B)) (as amended by section 101(c)(1)(B)) is amended by adding at the end the following:
(c) Fees for service or thing of value.—Section 102(b) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(b)) is amended by striking paragraph (2) and inserting the following:
“(2) FEES FOR SERVICE OR THING OF VALUE.—
“(A) IN GENERAL.—In accordance with section 9701 of title 31, United States Code, the Commission shall assess and collect fees from any person who receives a service or thing of value from the Commission to cover the costs to the Commission of providing the service or thing of value.
“(B) ADVANCED NUCLEAR REACTOR APPLICANTS.—The hourly rate charged for fees assessed and collected from an advanced nuclear reactor applicant under this paragraph relating to the review of a submitted application described in section 3(1) may not exceed the hourly rate for mission-direct program salaries and benefits.
“(C) ADVANCED NUCLEAR REACTOR PRE-APPLICANTS.—The hourly rate charged for fees assessed and collected from an advanced nuclear reactor pre-applicant under this paragraph relating to the review of submitted materials as described in the licensing project plan of an advanced nuclear reactor pre-applicant may not exceed the hourly rate for mission-direct program salaries and benefits.”.
(d) Sunset.—Section 102 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215) is amended by adding at the end the following:
Section 103 of the Nuclear Energy Innovation and Modernization Act (Public Law 115–439; 132 Stat. 5571) is amended by adding at the end the following:
“(f) Prizes for advanced nuclear reactor licensing.—
“(2) PRIZE FOR ADVANCED NUCLEAR REACTOR LICENSING.—
“(A) IN GENERAL.—Notwithstanding section 169 of the Atomic Energy Act of 1954 (42 U.S.C. 2209) and subject to the availability of appropriations, the Secretary is authorized to make, with respect to each award category described in subparagraph (C), an award in an amount described in subparagraph (B) to the first eligible entity—
“(i) to which the Commission issues an operating license for an advanced nuclear reactor under part 50 of title 10, Code of Federal Regulations (or successor regulations), for which an application has not been approved by the Commission as of the date of enactment of this subsection; or
“(B) AMOUNT OF AWARD.—Subject to paragraph (3), an award under subparagraph (A) shall be in an amount equal to the total amount assessed by the Commission and collected under section 102(b)(2) from the eligible entity receiving the award for costs relating to the issuance of the license described in that subparagraph, including, as applicable, costs relating to the issuance of an associated construction permit described in section 50.23 of title 10, Code of Federal Regulations (or successor regulations), or early site permit (as defined in section 52.1 of that title (or successor regulations)).
“(C) AWARD CATEGORIES.—An award under subparagraph (A) may be made for—
“(ii) an advanced nuclear reactor that—
“(I) uses isotopes derived from spent nuclear fuel (as defined in section 2 of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101)) or depleted uranium as fuel for the advanced nuclear reactor; and
“(iii) an advanced nuclear reactor that—
“(3) FEDERAL FUNDING LIMITATIONS.—
“(A) EXCLUSION OF TVA FUNDS.—In this paragraph, the term ‘Federal funds’ does not include funds received under the power program of the Tennessee Valley Authority established pursuant to the Tennessee Valley Authority Act of 1933 (16 U.S.C. 831 et seq.).
“(B) LIMITATION ON AMOUNTS EXPENDED.—An award under this subsection shall not exceed the total amount expended (excluding any expenditures made with Federal funds received for the applicable project and an amount equal to the minimum cost-share required under section 988 of the Energy Policy Act of 2005 (42 U.S.C. 16352)) by the eligible entity receiving the award for licensing costs relating to the project for which the award is made.
(a) In general.—Not later than 270 days after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report addressing any unique licensing issues or requirements relating to—
(b) Stakeholder input.—In developing the report under subsection (a), the Commission shall seek input from—
(c) Contents.—
(1) IN GENERAL.—The report under subsection (a) shall describe—
(A) any unique licensing issues or requirements relating to the matters described in paragraphs (1) through (3) of subsection (a), including, with respect to the nonelectric applications referred to in paragraphs (1) and (2) of that subsection, any licensing issues or requirements relating to the use of nuclear energy—
(B) options for addressing those issues or requirements—
(ii) as part of the technology-inclusive regulatory framework required under subsection (a)(4) of section 103 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2133 note; Public Law 115–439); or
(a) In general.—Section 102(b)(1)(B) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(b)(1)(B)) (as amended by section 201(b)) is amended by adding at the end the following:
“(vii) Costs for—
“(I) activities to review and approve or disapprove an application for an early site permit (as defined in section 52.1 of title 10, Code of Federal Regulations (or any successor regulation)) to demonstrate an advanced nuclear reactor on a Department of Energy site or critical national security infrastructure (as defined in section 327(d) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115–232; 132 Stat. 1722)) site; and
“(II) pre-application activities relating to an early site permit (as defined in section 52.1 of title 10, Code of Federal Regulations (or any successor regulation)) to demonstrate an advanced nuclear reactor on a Department of Energy site or critical national security infrastructure (as defined in section 327(d) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115–232; 132 Stat. 1722)) site.”.
(a) Definition.—Section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014) is amended—
(2) in each of subsections ee. through hh., by inserting a subsection heading, the text of which comprises the term defined in the subsection;
(3) by redesignating subsections ee., ff., gg., hh., and jj. as subsections jj., gg., hh., ii., and ff., respectively, and moving the subsections so as to appear in alphabetical order;
(b) Technical and conforming changes.—
(1) IN GENERAL.—Section 103(a) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2133 note; Public Law 115–439) is amended—
(2) DEFINITIONS.—Section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439) (as amended by section 201(a)) is amended—
(A) in paragraph (1), in the matter preceding subparagraph (A), by striking “or fusion reactor” and inserting “reactor or fusion machine”;
(B) by redesignating paragraphs (11) through (21) as paragraphs (12) through (22), respectively; and
(C) by inserting after paragraph (10) the following:
“(11) FUSION MACHINE.—The term ‘fusion machine’ has the meaning given the term in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014).”.
(c) Report.—
(1) DEFINITIONS.—In this subsection:
(A) AGREEMENT STATE.—The term “Agreement State” has the meaning given the term in section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439).
(B) FUSION MACHINE.—The term “fusion machine” has the meaning given the term in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014).
(2) REQUIREMENT.—Not later than 1 year after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report on—
(A) the results of a study, conducted in consultation with Agreement States and the private fusion sector, on risk- and performance-based, design-specific licensing frameworks for mass-manufactured fusion machines, including an evaluation of the design, manufacturing, and operations certification process used by the Federal Aviation Administration for aircraft as a potential model for mass-manufactured fusion machine regulations; and
(a) Definitions.—In this section:
(1) BROWNFIELD SITE.—The term “brownfield site” has the meaning given the term in section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9601).
(2) COVERED SITE.—The term “covered site” means a brownfield site, a retired fossil fuel site, or a site that is both a retired fossil fuel site and a brownfield site.
(3) PRODUCTION FACILITY.—The term “production facility” has the meaning given the term in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014).
(4) RETIRED FOSSIL FUEL SITE.—The term “retired fossil fuel site” means the site of 1 or more fossil fuel electric generation facilities that are retired or scheduled to retire, including multi-unit facilities that are partially shut down.
(5) UTILIZATION FACILITY.—The term “utilization facility” has the meaning given the term in section 11 of the Atomic Energy Act of 1954 (42 U.S.C. 2014).
(b) Identification of regulatory issues.—
(1) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Commission shall evaluate the extent to which modification of regulations, guidance, or policy is needed to enable efficient, timely, and predictable licensing reviews for, and to support the oversight of, production facilities or utilization facilities at covered sites.
(2) REQUIREMENT.—In carrying out paragraph (1), the Commission shall consider how licensing reviews for production facilities or utilization facilities at covered sites may be expedited by considering matters relating to siting and operating a production facility or a utilization facility at or near a covered site to support—
(c) Licensing.—
(1) IN GENERAL.—Not later than 2 years after the date of enactment of this Act, the Commission shall—
(2) REQUIREMENTS.—In carrying out paragraph (1), consistent with the mission of the Commission, the Commission shall consider matters relating to—
(D) previously completed environmental reviews required by the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(a) In general.—In accordance with this section, the Commission shall establish and carry out an expedited procedure for issuing a combined license pursuant to section 185 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2235(b)).
(b) Qualifications.—To qualify for the expedited procedure under subsection (a), an applicant—
(1) shall submit a combined license application for a new nuclear reactor that—
(A) references a design for which the Commission has issued a design certification (as defined in section 52.1 of title 10, Code of Federal Regulations (or any successor regulation)); or
(B) has a design that is substantially similar to a design of a nuclear reactor for which the Commission has issued a combined license, an operating license, or a manufacturing license under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.);
(c) Expedited procedure.—With respect to a combined license for which the applicant has satisfied the requirements described in subsection (b), the Commission shall, to the maximum extent practicable—
(1) not later than 18 months after the date on which the application is accepted for docketing—
(B) issue a final environmental impact statement or environmental assessment, unless the Commission finds that the proposed agency action is excluded pursuant to a categorical exclusion in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(d) Performance and reporting.—
(1) DELAYS IN ISSUANCE.—Not later than 30 days after the applicable deadline, the Executive Director for Operations of the Commission shall inform the Commission of any failure to meet a deadline under subsection (c).
(a) Micro-Reactor licensing.—The Commission shall—
(1) not later than 18 months after the date of enactment of this Act, develop risk-informed and performance-based strategies and guidance to license and regulate micro-reactors pursuant to section 103 of the Atomic Energy Act of 1954 (42 U.S.C. 2133), including strategies and guidance for—
(2) not later than 3 years after the date of enactment of this Act, implement, as appropriate, the strategies and guidance developed under paragraph (1)—
(B) through the technology-inclusive regulatory framework to be established under section 103(a)(4) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2133 note; Public Law 115–439); or
(b) Considerations.—In developing and implementing strategies and guidance under subsection (a), the Commission shall consider—
(a) In general.—The prohibitions against issuing certain licenses for utilization facilities to certain aliens, corporations, and other entities described in the second sentence of section 103 d. of the Atomic Energy Act of 1954 (42 U.S.C. 2133(d)) and the second sentence of section 104 d. of that Act (42 U.S.C. 2134(d)) shall not apply to an entity described in subsection (b) if the Commission determines that issuance of the applicable license to that entity is not inimical to—
(b) Entities described.—
(1) IN GENERAL.—An entity referred to in subsection (a) is an alien, corporation, or other entity that is owned, controlled, or dominated by—
(A) the government of—
(2) EXCLUSION.—A country described in this paragraph is a country—
(A) any department, agency, or instrumentality of the government of which, on the date of enactment of this Act, is subject to sanctions under section 231 of the Countering America’s Adversaries Through Sanctions Act (22 U.S.C. 9525); or
(B) any citizen, national, or entity of which, as of the date of enactment of this Act, is included on the List of Specially Designated Nationals and Blocked Persons maintained by the Office of Foreign Assets Control of the Department of the Treasury pursuant to sanctions imposed under section 231 of the Countering America’s Adversaries Through Sanctions Act (22 U.S.C. 9525).
(c) Technical amendment.—Section 103 d. of the Atomic Energy Act of 1954 (42 U.S.C. 2133(d)) is amended, in the second sentence, by striking “any any” and inserting “any”.
(d) Savings clause.—Nothing in this section affects the requirements of section 721 of the Defense Production Act of 1950 (50 U.S.C. 4565).
(a) In general.—Not later than 180 days after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report (referred to in this section as the “report”) on manufacturing and construction for nuclear energy projects.
(b) Stakeholder input.—In developing the report, the Commission shall seek input from—
(c) Contents.—
(1) IN GENERAL.—The report shall—
(A) examine any unique licensing issues or requirements relating to the use, for nuclear energy projects, of—
(B) examine—
(i) the requirements for nuclear-grade components in manufacturing and construction for nuclear energy projects;
(ii) opportunities to use standard materials, parts, or components in manufacturing and construction for nuclear energy projects;
(C) identify safety aspects of advanced manufacturing processes and advanced construction techniques that are not addressed by existing codes and standards, so that generic guidance may be updated or created, as necessary;
(D) identify options for addressing the issues, requirements, and opportunities examined under subparagraphs (A) and (B)—
Section 313 of division C of the Omnibus Appropriations Act, 2009 (42 U.S.C. 16274a), is amended—
(2) in subsection (b)(1), in the matter preceding subparagraph (A), by inserting “and subsection (c)” after “paragraph (2)”;
(3) in subsection (c)—
(B) by striking paragraph (1) and inserting the following:
“(1) ADVANCED NUCLEAR REACTOR.—The term ‘advanced nuclear reactor’ has the meaning given the term in section 951(b) of the Energy Policy Act of 2005 (42 U.S.C. 16271(b)).
“(3) INSTITUTION OF HIGHER EDUCATION.—The term ‘institution of higher education’ has the meaning given the term in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801).
“(4) NATIONAL LABORATORY.—The term ‘National Laboratory’ has the meaning given the term in section 951(b) of the Energy Policy Act of 2005 (42 U.S.C. 16271(b)).”;
(6) by inserting after subsection (b) the following:
“(c) Nuclear energy traineeship subprogram.—
“(1) IN GENERAL.—The Commission shall establish, as a subprogram of the Program, a nuclear energy traineeship subprogram under which the Commission, in coordination with institutions of higher education and trade schools, shall competitively award traineeships that provide focused training to meet critical mission needs of the Commission and nuclear workforce needs, including needs relating to the nuclear tradecraft workforce.
(a) Definitions.—In this section:
(1) HIGH-LEVEL RADIOACTIVE WASTE.—The term “high-level radioactive waste” has the meaning given the term in section 2 of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101).
(2) SPENT NUCLEAR FUEL.—The term “spent nuclear fuel” has the meaning given the term in section 2 of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101).
(b) Report.—Not later than January 1, 2026, and biennially thereafter, the Secretary of Energy shall submit to Congress a report that describes—
(1) the annual and cumulative amount of payments made by the United States to the holder of a standard contract due to a partial breach of contract under the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101 et seq.) resulting in financial damages to the holder;
(2) the cumulative amount spent by the Department of Energy since fiscal year 2008 to reduce future payments projected to be made by the United States to any holder of a standard contract due to a partial breach of contract under the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10101 et seq.);
(3) the cumulative amount spent by the Department of Energy to store, manage, and dispose of spent nuclear fuel and high-level radioactive waste in the United States as of the date of the report;
(4) the projected lifecycle costs to store, manage, transport, and dispose of the projected inventory of spent nuclear fuel and high-level radioactive waste in the United States, including spent nuclear fuel and high-level radioactive waste expected to be generated from existing reactors through 2050;
(5) any mechanisms for better accounting of liabilities for the lifecycle costs of the spent nuclear fuel and high-level radioactive waste inventory in the United States;
(6) any recommendations for improving the methods used by the Department of Energy for the accounting of spent nuclear fuel and high-level radioactive waste costs and liabilities;
(7) any actions taken in the previous fiscal year by the Department of Energy with respect to interim storage; and
(8) any activities taken in the previous fiscal year by the Department of Energy to develop and deploy nuclear technologies and fuels that enhance the safe transportation or storage of spent nuclear fuel or high-level radioactive waste, including technologies to protect against seismic, flooding, and other extreme weather events.
(a) In General.—The Commission shall establish an initiative to enhance preparedness and coordination with respect to the qualification and licensing of advanced nuclear fuel.
(b) Agency Coordination.—Not later than 180 days after the date of enactment of this Act, the Commission and the Secretary of Energy shall enter into a memorandum of understanding—
(1) to share technical expertise and knowledge through—
(A) enabling the testing and demonstration of accident tolerant fuels for existing commercial nuclear reactors and advanced nuclear reactor fuel concepts to be proposed and funded, in whole or in part, by the private sector;
(B) operating a database to store and share data and knowledge relevant to nuclear science and engineering between Federal agencies and the private sector;
(2) to ensure that—
(A) the Department of Energy has sufficient technical expertise to support the timely research, development, demonstration, and commercial application of advanced nuclear fuel;
(B) the Commission has sufficient technical expertise to support the evaluation of applications for licenses, permits, and design certifications and other requests for regulatory approval for advanced nuclear fuel;
(C) (i) the Department of Energy maintains and develops the facilities necessary to enable the timely research, development, demonstration, and commercial application by the civilian nuclear industry of advanced nuclear fuel; and
(D) the Commission consults, as appropriate, with the modeling and simulation experts at the Office of Nuclear Energy of the Department of Energy, at the National Laboratories, and within industry fuel vendor teams in cooperative agreements with the Department of Energy to leverage physics-based computer modeling and simulation capabilities.
(c) Report.—
(1) IN GENERAL.—Not later than 2 years after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report describing the efforts of the Commission under subsection (a), including—
(a) Update.—Not later than 1 year after the date of enactment of this Act, the Commission shall, while remaining consistent with the policies of the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) and the Energy Reorganization Act of 1974 (42 U.S.C. 5801 et seq.) (including to provide reasonable assurance of adequate protection of the public health and safety, to promote the common defense and security, and to protect the environment), update the mission statement of the Commission to include that licensing and regulation of the civilian use of radioactive materials and nuclear energy be conducted in a manner that is efficient and does not unnecessarily limit—
(a) Commission workforce.—
(1) GENERAL AUTHORITY.—The Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) is amended by inserting after section 161A the following:
“SEC. 161B. Commission workforce.
“(a) Direct hire authority.—
“(1) IN GENERAL.—Notwithstanding section 161 d. of this Act and any provision of Reorganization Plan No. 1 of 1980 (94 Stat. 3585; 5 U.S.C. app.), and without regard to any provision of title 5 (except section 3328), United States Code, governing appointments in the civil service, the Chairman of the Nuclear Regulatory Commission (in this section referred to as the ‘Chairman’) may, in order to carry out the Nuclear Regulatory Commission’s (in this section referred to as the ‘Commission’) responsibilities and activities in a timely, efficient, and effective manner and subject to the limitations described in paragraphs (2), (3), and (4)—
“(2) LIMITATIONS.—
“(A) NUMBER.—
“(3) LEVEL OF POSITIONS.—To the extent practicable, in carrying out paragraph (1) the Chairman shall recruit and directly appoint exceptionally well-qualified individuals into the excepted service to entry, mid, and senior level covered positions, including term-limited covered positions.
“(4) CONSIDERATION OF FUTURE WORKFORCE NEEDS.—When recruiting and directly appointing exceptionally well-qualified individuals to covered positions pursuant to paragraph (1)(A), to maintain sufficient flexibility under the limitations of paragraph (2)(A)(i), the Chairman shall consider the future workforce needs of the Commission to carry out its responsibilities and activities in a timely, efficient, and effective manner.
“(b) Addressing insufficient compensation of employees and other personnel of the commission.—
“(1) IN GENERAL.—Notwithstanding any other provision of law, the Chairman may fix the compensation for employees or other personnel serving in a covered position without regard to any provision of title 5, United States Code, governing General Schedule classification and pay rates.
“(2) APPLICABILITY.—The authority under this subsection to fix the compensation of employees or other personnel shall apply with respect to an employee or other personnel serving in a covered position regardless of when the employee or other personnel was hired.
“(3) LIMITATIONS ON COMPENSATION.—
“(A) ANNUAL RATE.—The Chairman may not use the authority under paragraph (1) to fix the compensation of employees or other personnel—
“(c) Additional compensation authority.—
“(1) FOR NEW EMPLOYEES.—The Chairman may pay an individual recruited and directly appointed under subsection (a) a 1-time hiring bonus in an amount not to exceed $25,000.
“(2) FOR EXISTING EMPLOYEES.—
“(A) IN GENERAL.—Subject to subparagraphs (B) and (C), an employee or other personnel who the Chairman determines exhibited exceptional performance in a fiscal year may be paid a performance bonus in an amount not to exceed the least of—
“(B) EXCEPTIONAL PERFORMANCE.—Exceptional performance under subparagraph (A) includes—
“(i) leading a project team in a timely and efficient licensing review to enable the safe use of nuclear technology;
“(ii) making significant contributions to a timely and efficient licensing review to enable the safe use of nuclear technology;
“(C) LIMITATIONS.—
“(i) SUBSEQUENT BONUSES.—Any person who receives a performance bonus under subparagraph (A) may not receive another performance bonus under that subparagraph for a period of 5 years thereafter.
“(d) Implementation plan and report.—
“(1) IN GENERAL.—Not later than 180 days after the date of enactment of this section, the Chairman shall develop and implement a plan to carry out this section. Before implementing such plan, the Chairman shall submit to the Committee on Energy and Commerce of the House of Representatives, the Committee on Environment and Public Works of the Senate, and the Office of Personnel Management a report on the details of the plan.
“(e) Delegation.—The Chairman shall delegate, subject to the direction and supervision of the Chairman, the authority provided by subsections (a), (b), and (c) to the Executive Director for Operations of the Commission.
“(f) Information on hiring, vacancies, and compensation.—
“(1) IN GENERAL.—The Commission shall include in its budget materials submitted in support of the budget of the President (submitted to Congress pursuant to section 1105 of title 31, United States Code), for fiscal year 2026 and each fiscal year thereafter, information relating to hiring, vacancies, and compensation at the Commission.
“(2) INCLUSIONS.—The information described in paragraph (1) shall include—
“(A) an analysis of any trends with respect to hiring, vacancies, and compensation at the Commission;
“(B) a description of the efforts to retain and attract employees or other personnel to serve in covered positions at the Commission;
“(C) information that describes—
“(i) how the authority provided by subsection (a) is being used to address the hiring needs of the Commission;
“(ii) the total number of exceptionally well-qualified individuals serving in—
“(iii) how the authority provided by subsection (b) is being used to address the hiring or retention needs of the Commission;
“(iv) the total number of employees or other personnel serving in a covered position that have their compensation fixed pursuant to subsection (b); and
“(v) the attrition levels with respect to term-limited covered positions appointed under subsection (a)(1)(B), including the number of individuals leaving a term-limited covered position before completion of the applicable term of service and the average length of service for such individuals as a percentage of the applicable term of service; and
“(g) Covered position.—In this section, the term ‘covered position’ means—
“(h) Sunset.—
“(1) IN GENERAL.—Except as provided in paragraph (2), the authorities provided by subsections (a) and (b) shall terminate on September 30, 2034.
“(2) CERTIFICATION.—If, no later than the date referenced in paragraph (1), the Commission issues a certification that the authorities provided by subsection (a), subsection (b), or both subsections are necessary for the Commission to carry out its responsibilities and activities in a timely, efficient, and effective manner, the authorities provided by the applicable subsection shall terminate on September 30, 2039.
(b) Government accountability office report.—Not later than September 30, 2033, the Comptroller General of the United States shall submit to the Committee on Energy and Commerce and the Committee on Oversight and Accountability of the House of Representatives and the Committee on Environment and Public Works and the Committee on Homeland Security and Governmental Affairs of the Senate a report that—
(1) evaluates the extent to which the authorities provided under subsections (a), (b), and (c) of section 161B of the Atomic Energy Act of 1954 (as added by this Act) have been utilized;
(2) describes the role in which the exceptionally well-qualified individuals recruited and directly appointed pursuant to section 161B(a) of the Atomic Energy Act of 1954 (as added by this Act) have been utilized to support the licensing of advanced nuclear reactors;
(a) Report.—Not later than 3 years after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress and make publicly available a report that describes—
(1) the progress on the implementation of section 102(a)(3) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(a)(3)); and
(b) Limitation on corporate support costs.—Section 102(a)(3) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(a)(3)) is amended by striking subparagraphs (B) and (C) and inserting the following:
(c) Corporate support costs clarification.—Paragraph (10) of section 3 of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215 note; Public Law 115–439) (as redesignated by section 201(a)(1)) is amended—
Section 102(c) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(c)) is amended—
(2) by adding at the end the following:
“(4) PERIODIC UPDATES TO METRICS AND SCHEDULES.—
(a) Office of nuclear reactor regulation.—Section 203 of the Energy Reorganization Act of 1974 (42 U.S.C. 5843) is amended—
(2) in subsection (b)—
(4) by inserting after subsection (b) the following:
“(c) Licensing process.—In carrying out the principal licensing and regulation functions under subsection (b)(1), the Director of Nuclear Reactor Regulation shall—
“(1) establish techniques and guidance for evaluating applications for licenses for nuclear reactors to support efficient, timely, and predictable reviews of applications for those licenses to enable the safe and secure use of nuclear reactors;
(b) Efficient licensing reviews.—
(1) GENERAL.—Section 181 of the Atomic Energy Act of 1954 (42 U.S.C. 2231) is amended—
(c) Construction Permits and Operating Licenses.—Section 185 of the Atomic Energy Act of 1954 (42 U.S.C. 2235) is amended by adding at the end the following:
“c. Application reviews for production and utilization facilities of an existing site.—In reviewing an application for an early site permit, construction permit, operating license, or combined construction permit and operating license for a production facility or utilization facility located at the site of a production facility or utilization facility licensed by the Commission, the Commission shall, to the extent practicable, use information that was part of the licensing basis of the licensed production facility or utilization facility.”.
(a) In general.—Not later than 180 days after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress a report on the efforts of the Commission to facilitate efficient, timely, and predictable environmental reviews of nuclear reactor applications for a license under section 103 of the Atomic Energy Act of 1954 (42 U.S.C. 2133), including through expanded use of categorical exclusions, environmental assessments, and generic environmental impact statements.
(b) Report.—In completing the report under subsection (a), the Commission shall—
(1) describe the actions the Commission will take to implement the amendments to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) made by section 321 of the Fiscal Responsibility Act of 2023 (Public Law 118–5; 137 Stat. 38);
(2) consider—
(A) using, through adoption, incorporation by reference, or other appropriate means, categorical exclusions, environmental assessments, and environmental impact statements prepared by other Federal agencies to streamline environmental reviews of applications described in subsection (a) by the Commission;
(B) using categorical exclusions, environmental assessments, and environmental impact statements prepared by the Commission to streamline environmental reviews of applications described in subsection (a) by the Commission;
(C) using mitigated findings of no significant impact in environmental reviews of applications described in subsection (a) by the Commission to reduce the impact of a proposed action to a level that is not significant;
(D) the extent to which the Commission may rely on prior studies or analyses prepared by Federal, State, and local governmental permitting agencies to streamline environmental reviews of applications described in subsection (a) by the Commission;
(E) opportunities to coordinate the development of environmental assessments and environmental impact statements with other Federal agencies to avoid duplicative environmental reviews and to streamline environmental reviews of applications described in subsection (a) by the Commission;
(F) opportunities to streamline formal and informal consultations and coordination with other Federal, State, and local governmental permitting agencies during environmental reviews of applications described in subsection (a) by the Commission;
(G) opportunities to streamline the Commission’s analyses of alternatives, including the Commission’s analysis of alternative sites, in environmental reviews of applications described in subsection (a) by the Commission;
(H) establishing new categorical exclusions that could be applied to actions relating to new applications described in subsection (a);
(I) amending section 51.20(b) of title 10, Code of Federal Regulations, to allow the Commission to determine, on a case-specific basis, whether an environmental assessment (rather than an environmental impact statement or supplemental environmental impact statement) is appropriate for a particular application described in subsection (a), including in proceedings in which the Commission relies on a generic environmental impact statement for advanced nuclear reactors;
(J) authorizing the use of an applicant’s environmental impact statement as the Commission’s draft environmental impact statement, consistent with section 107(f) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(f));
(K) opportunities to adopt online and digital technologies, including technologies that would allow applicants and cooperating agencies to upload documents and coordinate with the Commission to edit documents in real time, that would streamline communications between—
(L) in addition to implementing measures under paragraph (3), potential revisions to part 51 of title 10, Code of Federal Regulations, and relevant Commission guidance documents—
(i) to facilitate efficient, timely, and predictable environmental reviews of applications described in subsection (a);
(iv) to meet obligations under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(a) Definition of licensee.—In this section, the term “licensee” means a person that holds a license issued under section 103 or 104 of the Atomic Energy Act of 1954 (42 U.S.C. 2133, 2134).
(b) Report.—Not later than 1 year after the date of enactment of this Act, the Commission shall develop and submit to the appropriate committees of Congress a report that identifies specific improvements to the nuclear reactor and materials oversight and inspection programs carried out pursuant to the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) that the Commission may implement to maximize the efficiency of such programs through, where appropriate, the use of risk-informed, performance-based procedures, expanded incorporation of information technologies, and staff training.
(c) Stakeholder input.—In developing the report under subsection (b), the Commission shall, as appropriate, seek input from—
(d) Contents.—The report submitted under subsection (b) shall—
(1) assess specific elements of oversight and inspections that may be modified by the use of technology, improved planning, and continually updated risk-informed, performance-based assessment, including—
(2) identify and assess measures to improve oversight and inspections, including—
(3) assess measures to advance risk-informed procedures, including—
(A) increased use of inspection approaches that balance the level of resources commensurate with safety significance;
(4) assess the ability of the Commission, consistent with the mission of the Commission, to enable licensee innovations that may advance nuclear reactor operational efficiency and safety, including the criteria of the Commission for timely acceptance of licensee adoption of advanced technologies, including digital technologies;
(5) identify recommendations resulting from the assessments described in paragraphs (1) through (4);
Section 104 c. of the Atomic Energy Act of 1954 (42 U.S.C. 2134(c)) is amended—
(1) by striking the third sentence and inserting the following:
“(3) LIMITATION ON UTILIZATION FACILITIES.—The Commission may issue a license under this section for a utilization facility useful in the conduct of research and development activities of the types specified in section 31 if—
Not later than 1 year after the date of enactment of this Act, the Commission shall submit to the appropriate committees of Congress, the Committee on Foreign Relations of the Senate, the Committee on Energy and Natural Resources of the Senate, and the Committee on Foreign Affairs of the House of Representatives a report describing any engagement between the Commission and the Government of Canada with respect to nuclear waste issues in the Great Lakes Basin.
Nothing in this Act affects authorities of the Department of State.
Amend the title so as to read: “A bill to authorize appropriations for the United States Fire Administration and firefighter assistance grant programs, to advance the benefits of nuclear energy, and for other purposes.”.
Attest:
Clerk.
| |||||
AMENDMENTS | |||||