117th CONGRESS 1st Session |
To provide for the consideration of energy storage systems by electric utilities as part of a supply side resource process, and for other purposes.
April 22, 2021
Mr. Takano introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned
To provide for the consideration of energy storage systems by electric utilities as part of a supply side resource process, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
This Act may be cited as the “Storage Technology for Operational Readiness And Generating Energy Act” or the “S.T.O.R.A.G.E. Act”.
SEC. 2. Consideration of energy storage systems.
(a) In general.—Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
“(20) CONSIDERATION OF ENERGY STORAGE SYSTEMS.—Each State shall consider requiring that, as part of a supply side resource planning process, an electric utility of the State demonstrate to the State that the electric utility considered an investment in energy storage systems based on appropriate factors, including—
“(A) total costs and normalized life cycle costs;
“(B) cost effectiveness;
“(C) improved reliability;
“(D) security; and
“(E) system performance and efficiency.”.
(b) Time limitations.—Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following:
“(7) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State regulatory authority has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (20) of section 111(d).
“(B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State regulatory authority has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 111 with respect to the standard established by paragraph (20) of section 111(d).”.
(c) Failure To comply.—Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended—
(1) by striking “subsection (b)(2)” and inserting “subsection (b)”; and
(2) by adding at the end the following: “In the case of the standard established by paragraph (20) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph.”.
(d) Prior State actions.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following:
“(g) Prior State actions.—Subsections (b) and (c) of this section shall not apply to the standard established by paragraph (20) of section 111(d) in the case of any electric utility in a State if, before the enactment of this subsection—
“(1) the State has implemented for such utility the standard concerned (or a comparable standard);
“(2) the State regulatory authority for such State or relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for such utility; or
“(3) the State legislature has voted on the implementation of such standard (or a comparable standard) for such utility.”.
(e) Prior and pending proceedings.—Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: “In the case of the standard established by paragraph (20) of section 111(d), the reference contained in this section to the date of the enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraph (20).”.
SEC. 3. Coordination of programs.
To the maximum extent practicable, the Secretary of Energy shall ensure that the funding and administration of the different offices within the Grid Modernization Initiative of the Department of Energy and other programs conducting energy storage research are coordinated and streamlined.