To amend the Federal Water Pollution Control Act to reauthorize certain water pollution control programs, and for other purposes.
March 16, 2021
Mr. DeFazio (for himself, Mrs. Napolitano, and Mr. Fitzpatrick) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure
June 22, 2021
Additional sponsors: Mr. Pappas, Mr. Huffman, Ms. Brownley, Mr. Lynch, Ms. Johnson of Texas, Ms. Norton, Ms. Strickland, Mr. Carson, Ms. Titus, Ms. Wilson of Florida, Mr. Cohen, Mr. Johnson of Georgia, Mr. Sean Patrick Maloney of New York, Ms. Newman, Mr. Brown, Mr. Lowenthal, Mr. Carbajal, Ms. Moore of Wisconsin, Mr. Van Drew, Ms. Lee of California, Mr. Payne, Mr. García of Illinois, Mr. Malinowski, Mr. Harder of California, Ms. DelBene, Mr. Sires, Mr. Thompson of California, Ms. Roybal-Allard, Ms. Eshoo, Ms. Bonamici, Ms. Lofgren, Ms. Bourdeaux, Mr. Tonko, Ms. Chu, Mr. Swalwell, Mr. Costa, Mr. Larsen of Washington, Mr. DeSaulnier, Ms. Williams of Georgia, Mr. Stanton, Mr. Auchincloss, Mr. Cooper, Mr. Lamb, Mrs. Trahan, Mr. Nadler, Ms. Velázquez, Ms. Matsui, Mr. Beyer, Mr. Cárdenas, Mr. Takano, Ms. Barragán, Mr. Moulton, Mr. Blumenauer, Ms. Blunt Rochester, Mr. Norcross, Ms. Davids of Kansas, Mr. Raskin, Ms. Slotkin, Mr. Allred, Mr. Garamendi, Ms. Kaptur, Mr. Kilmer, Mr. Suozzi, Mr. Carter of Louisiana, and Ms. Scanlon
June 22, 2021
Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed
[Strike out all after the enacting clause and insert the part printed in italic]
[For text of introduced bill, see copy of bill as introduced on March 16, 2021]
To amend the Federal Water Pollution Control Act to reauthorize certain water pollution control programs, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
(a) Short title.—This Act may be cited as the “Water Quality Protection and Job Creation Act of 2021”.
(b) Table of contents.—The table of contents for this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Wastewater infrastructure workforce investment.
Sec. 3. Technical assistance to rural, small, and Tribal municipalities.
Sec. 4. State management assistance.
Sec. 5. Watershed, wet weather, and resiliency projects.
Sec. 6. Waiver of matching requirement for grants to District of Columbia.
Sec. 7. Pilot program for alternative water source projects.
Sec. 8. Sewer overflow and stormwater reuse municipal grants.
Sec. 9. Grants for the treatment of emerging contaminants.
Sec. 10. Household wastewater grant program.
Sec. 11. Smart wastewater infrastructure technology grant program.
Sec. 12. Reports to Congress.
Sec. 13. Indian Tribes.
Sec. 14. Capitalization grants.
Sec. 15. Water pollution control revolving loan funds.
Sec. 16. Allotment of funds.
Sec. 17. Reservation of funds for territories of the United States.
Sec. 18. Authorization of appropriations.
Sec. 19. Technical assistance by Municipal Ombudsman.
Sec. 20. Report on wastewater infrastructure funding for rural, economically disadvantaged, and Tribal communities.
Sec. 21. Water Reuse Interagency Working Group.
Section 104(g) of the Federal Water Pollution Control Act (33 U.S.C. 1254(g)) is amended—
(2) by amending paragraph (4) to read as follows:
“(4) REPORT TO CONGRESS ON PUBLICLY OWNED TREATMENT WORKS WORKFORCE DEVELOPMENT.—Not later than 2 years after the date of enactment of the Water Quality Protection and Job Creation Act of 2021, the Administrator, in consultation with the Secretary of Labor, shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report containing—
“(A) an assessment of the current and future workforce needs for publicly owned treatment works, including an estimate of the number of future positions needed for such treatment works and the technical skills and education needed for such positions;
(a) Reauthorization.—Section 104(u) of the Federal Water Pollution Control Act (33 U.S.C. 1254(u)) is amended—
(3) by inserting “; and (8) not to exceed $100,000,000 for each of fiscal years 2022 through 2026 for carrying out subsections (b)(3), (b)(8), and (g), except that not less than half of the amounts so appropriated to carry out such subsections in each such fiscal year shall be used for carrying out subsection (b)(8)” before the period at the end.
(b) Communication.—A nonprofit organization receiving a grant under section 104(b)(8) of the Federal Water Pollution Control Act (33 U.S.C. 1254(b)(8)) shall, prior to carrying out an activity using such grant funds, consult with the State in which such activity is to be carried out.
(c) Report.—Not later than 2 years after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall submit to Congress a report that describes the implementation of the grants made under subsections (b)(3), (b)(8), and (g) of section 104 of the Federal Water Pollution Control Act (33 U.S.C. 1254) during the 2 fiscal years preceding the date of the report, including a description of the recipients and amounts of such grants.
(a) Authorization of appropriations.—Section 106(a) of the Federal Water Pollution Control Act (33 U.S.C. 1256(a)) is amended—
(b) Technical amendment.—Section 106(e) of the Federal Water Pollution Control Act (33 U.S.C. 1256(e)) is amended by striking “Beginning in fiscal year 1974 the” and inserting “The”.
(a) Increased resilience of treatment works.—Section 122(a)(6) of the Federal Water Pollution Control Act (33 U.S.C. 1274(a)(6)) is amended to read as follows:
“(6) INCREASED RESILIENCE OF TREATMENT WORKS.—Efforts—
“(A) to assess future risks and vulnerabilities of publicly owned treatment works to manmade or natural disasters, including extreme weather events, drought, and sea level rise; and
“(B) to carry out the planning, design, or construction of projects, on a systemwide or areawide basis, to increase the resilience of publicly owned treatment works through—
“(ii) the enhancement of wastewater (including stormwater) management by increasing watershed preservation and protection, including through—
“(iii) the modification or relocation of an existing publicly owned treatment works at risk of being significantly impaired or damaged by a manmade or natural disaster;
(b) Requirements; authorization of appropriations.—Section 122 of the Federal Water Pollution Control Act (33 U.S.C. 1274) is amended by striking subsection (c) and inserting the following:
“(c) Requirements.—The requirements of section 608 shall apply to any construction, alteration, maintenance, or repair of treatment works carried out using a grant under this section.
“(d) Assistance.—The Administrator shall use not less than 15 percent of the amounts appropriated pursuant to this section in a fiscal year to provide assistance to municipalities with a population of less than 10,000, or for economically disadvantaged communities (as defined in section 20 of the Water Quality Protection and Job Creation Act of 2021), to the extent there are sufficient eligible applications.
(c) Technical and conforming amendments.—
(1) WATERSHED PILOT PROJECTS.—Section 122 of the Federal Water Pollution Control Act (33 U.S.C. 1274) is amended—
(2) WATER POLLUTION CONTROL REVOLVING LOAN FUNDS.—Section 603(c)(7) of the Federal Water Pollution Control Act (33 U.S.C. 1383(c)(7)) is amended by striking “watershed”.
Section 202(a) of the Federal Water Pollution Control Act (33 U.S.C. 1282(a)) is amended by adding at the end the following:
(a) Selection of projects.—Section 220(d) of the Federal Water Pollution Control Act (33 U.S.C. 1300(d)) is amended—
(b) Committee resolution procedure; assistance.—Section 220 of the Federal Water Pollution Control Act (33 U.S.C. 1300) is amended by striking subsection (e) and inserting the following:
“(e) Assistance.—The Administrator shall use not less than 15 percent of the amounts appropriated pursuant to this section in a fiscal year to provide assistance to eligible entities for projects designed to serve fewer than 10,000 individuals, to the extent there are sufficient eligible applications.”.
(c) Requirements.—Section 220 of the Federal Water Pollution Control Act (33 U.S.C. 1300) is amended by redesignating subsections (i) and (j) as subsections (j) and (k), respectively, and inserting after subsection (h) the following:
(d) Definitions.—Section 220(j)(1) of the Federal Water Pollution Control Act (as redesignated by subsection (c) of this section) is amended by striking “or by treating wastewater” and inserting “(including stormwater), or by treating wastewater (including stormwater) for groundwater recharge, potable reuse, or other purposes”.
(e) Authorization of appropriations.—Section 220(k) of the Federal Water Pollution Control Act (as redesignated by subsection (c) of this section) is amended by striking “a total of $75,000,000 for fiscal years 2002 through 2004” and inserting “$200,000,000 for each of fiscal years 2022 through 2026”.
Section 221 of the Federal Water Pollution Control Act (33 U.S.C. 1301) is amended—
(1) in subsection (c), by striking “subsection (b),” each place it appears and inserting “this section,”;
(2) in subsection (d)—
(B) by striking “The non-Federal share” and inserting the following:
(3) in subsection (e), by striking “section 513” and inserting “section 513, or the requirements of section 608,”; and
Title II of the Federal Water Pollution Control Act (33 U.S.C. 1281 et seq.) is amended by adding at the end the following:
“SEC. 222. Emerging contaminants.
“(a) In general.—The Administrator shall award grants to owners of publicly owned treatment works to be used for the implementation of a pretreatment standard or effluent limitation developed pursuant to this Act for the introduction into a treatment works, or the discharge of, any pollutant that is a perfluoroalkyl or polyfluoroalkyl substance or any pollutant identified by the Administrator as a contaminant of emerging concern.
Title II of the Federal Water Pollution Control Act (33 U.S.C. 1281 et seq.) is further amended by adding at the end the following:
“SEC. 223. Household wastewater grant program.
“(a) Establishment.—The Administrator shall establish a program to provide grants to municipalities or qualified nonprofit entities to provide assistance to eligible individuals—
“(1) for the construction, repair, or replacement of an individual household decentralized wastewater treatment system;
“(b) Application.—To be eligible to receive a grant under this subsection, a municipality or qualified nonprofit entity shall submit to the Administrator an application at such time, in such manner, and containing such information as the Administrator determines to be appropriate.
“(c) Priority.—In providing grants under this section, the Administrator shall, to the maximum extent practicable, prioritize applications for activities that will assist eligible individuals residing in households that are not connected to a system or technology designed to treat domestic sewage, including eligible individuals using household cesspools.
“(d) Administrative expenses.—
“(e) Report.—Not later than 2 years after the date of enactment of this section, the Administrator shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report describing the recipients of grants and assistance under this section and the results of the program established under this section.
“(f) Application of other requirements.—The requirements of sections 513 and 608 shall apply to any project for the construction, repair, or replacement of a decentralized wastewater treatment system, or for the connection of a household to a treatment works, for which assistance is received under this section.
Title II of the Federal Water Pollution Control Act (33 U.S.C. 1281 et seq.) is further amended by adding at the end the following:
“SEC. 224. Smart wastewater infrastructure technology grant program.
“(a) Grants.—The Administrator shall establish a program to provide grants to municipalities for projects for the planning, design, and construction, at publicly owned treatment works, of—
“(1) intelligent sewage or stormwater collection systems, including such collection systems that incorporate technologies that rely on—
“(b) Assistance.—The Administrator shall use not less than 20 percent of the amounts appropriated pursuant to this section in a fiscal year to provide assistance to municipalities with a population of less than 10,000, to the extent there are sufficient eligible applications.
“(c) Cost share.—
“(d) Program implementation.—
“(1) GUIDANCE.—Not later than 30 days after the date of enactment of this section, the Administrator shall issue guidance to municipalities on how to apply for a grant under this section.
“(2) DECISION ON APPLICATIONS.—Not later than 30 days after the date on which the Administrator receives an application for a grant under this section, the Administrator shall determine whether to provide such grant.
“(e) Compliance with Buy America.—The requirements of section 608 shall apply to any project for construction for which assistance is received under this section.
“(f) Report to Congress.—Not later than 180 days after the date of enactment of this section, and annually thereafter, the Administrator shall submit to Congress a report describing projects funded under this section, any related improvement of the resiliency of publicly owned treatment works, and recommendations to improve the grant program established under this section.
(a) Biennial estimates.—Section 516(b)(1) of the Federal Water Pollution Control Act (33 U.S.C. 1375(b)(1)) is amended by striking “(B) a detailed estimate, biennially revised, of the cost of construction of all needed publicly owned treatment works in all of the States and of the cost of construction of all needed publicly owned treatment works in each of the States;” and inserting “(B) a detailed estimate, biennially revised, of the cost of construction of all planned publicly owned treatment works in all of the States and all needed publicly owned treatment works in all of the States, and the cost of construction of all planned publicly owned treatment works in each of the States and all needed publicly owned treatment works in each of the States, which estimates shall include (i) the cost of construction to rehabilitate or upgrade all existing publicly owned treatment works (excluding any pipe or other device or system for the conveyance of wastewater), every 20 years, including the costs to implement measures necessary to address the resilience and sustainability of publicly owned treatment works to manmade or natural disasters, and (ii) the cost of construction to replace 10 percent of existing publicly owned pipes and other devices and systems for the conveyance of wastewater to such treatment works over the 20-year period following the date of the estimate;”.
(b) Annual report on use of funds.—Section 516 of the Federal Water Pollution Control Act (33 U.S.C. 1375) is amended by adding at the end the following:
“(f) Annual report on use of funds.—Not later than 18 months after the date of enactment of this subsection, and annually thereafter, the Administrator shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—
(a) In general.—Section 518(c) of the Federal Water Pollution Control Act (33 U.S.C. 1377(c)) is amended—
(1) by striking paragraphs (1) and (2) and inserting the following:
“(1) IN GENERAL.—For each fiscal year, the Administrator shall reserve, of the funds made available to carry out title VI (before allotments to the States under section 604(a)), the greater of—
(b) Additional assistance.—
(1) AUTHORIZATION OF APPROPRIATIONS.—In addition to amounts otherwise made available under title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et seq.), there is authorized to be appropriated $500,000,000 for each of fiscal years 2022 through 2026 to make grants, in cooperation with the Director of the Indian Health Service, to entities described in section 518(c)(3) of the Federal Water Pollution Control Act (33 U.S.C. 1377) for—
(A) projects and activities eligible for assistance under section 603(c) of such Act (33 U.S.C. 1383); and
(2) NO MATCHING REQUIREMENT.—The Administrator may not require an entity receiving a grant under paragraph (1) to provide, as a condition of receiving such grant, a share of the cost of the project or activity for which such grant was made.
(3) LIMITATION.—Not more than $2,000,000 of amounts made available in a fiscal year to carry out this subsection may be used for grants under paragraph (1)(B).
(4) APPLICATION OF OTHER REQUIREMENTS.—The requirements of sections 513 and 608 of the Federal Water Pollution Control Act (33 U.S.C. 1372, 1388) shall apply to any project for the construction, alteration, maintenance, or repair of treatment works for which a grant is received under paragraph (1).
(a) Specific requirements.—Section 602(b) of the Federal Water Pollution Control Act (33 U.S.C. 1382(b)) is amended—
(1) in paragraph (13)(B)—
(3) by adding at the end the following:
“(15) to the extent there are sufficient projects or activities eligible for assistance from the fund, with respect to funds for capitalization grants received by the State under this title and section 205(m)—
(b) Corrosion control.—Section 602 of the Federal Water Pollution Control Act (33 U.S.C. 1382) is amended by adding at the end the following:
“(c) Corrosion control.—
“(1) IN GENERAL.—To the greatest extent practicable, the Administrator shall encourage the incorporation of corrosion prevention activities in projects and activities carried out using financial assistance provided under or pursuant to this title.
“(2) ACTIVITIES.—In carrying out paragraph (1), the Administrator, to the greatest extent practicable, shall ensure that any recipient of financial assistance under or pursuant to this title—
Section 603 of the Federal Water Pollution Control Act (33 U.S.C. 1383) is amended—
(1) in subsection (c)(10), by inserting “, including measures to identify and address cybersecurity vulnerabilities of such treatment works” before the semicolon; and
(2) in subsection (i)—
(A) in paragraph (1)—
(B) by amending paragraph (3) to read as follows:
“(3) SUBSIDIZATION AMOUNTS.—
“(A) IN GENERAL.—A State may use for providing additional subsidization in a fiscal year under this subsection an amount that does not exceed the greater of—
“(B) MINIMUM.—To the extent there are sufficient applications for additional subsidization under this subsection that meet the criteria under paragraph (1)(A), a State shall use for providing additional subsidization in a fiscal year under this subsection an amount that is not less than 20 percent of the total amount received by the State in capitalization grants under this title for the fiscal year.”.
(a) Formula.—Section 604(a) of the Federal Water Pollution Control Act (33 U.S.C. 1384(a)) is amended by striking “each of fiscal years 1989 and 1990” and inserting “each fiscal year”.
(b) Wastewater infrastructure workforce development.—Section 604 of the Federal Water Pollution Control Act (33 U.S.C. 1384) is amended by adding at the end the following:
(c) Needs survey.—Section 604 of the Federal Water Pollution Control Act (33 U.S.C. 1384) is further amended by adding at the end the following:
(d) Funds allotted to Puerto Rico.—Section 604 of the Federal Water Pollution Control Act (33 U.S.C. 1384) is further amended by adding at the end the following:
“(f) Funds allotted to Puerto Rico.—Notwithstanding any other provision of law, no funds allotted to the Commonwealth of Puerto Rico under this section may be counted as income or an asset of the owner or operator of a publicly owned treatment works receiving such funds, or be used, set aside, or otherwise made available for the purposes of payment of debt restructuring under the Puerto Rico Oversight, Management, and Economic Stability Act (48 U.S.C. 2101 et seq.) by the Puerto Rico Financial Oversight and Management Board.”.
Title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et seq.) is amended by striking section 607 and inserting the following:
“SEC. 607. Reservation of funds for territories of the United States.
“(a) In general.—
“(1) RESERVATION.—For each fiscal year, the Administrator shall reserve 1.5 percent of available funds, as determined under paragraph (2).
Title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et seq.) is amended by adding at the end the following:
Section 4(b)(1) of the Water Infrastructure Improvement Act (42 U.S.C. 4370j(b)(1)) is amended to read as follows:
“(1) technical and planning assistance to support municipalities, including municipalities that are rural, small, economically disadvantaged, or Tribal communities, in achieving and maintaining compliance with enforceable deadlines, goals, and requirements of the Federal Water Pollution Control Act; and”.
(a) Study.—Not later than 90 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall initiate a study on the distribution of wastewater infrastructure funds to rural communities, economically disadvantaged communities, and Tribal communities during the 20 fiscal years preceding the date of enactment of this Act.
(b) Requirements.—In carrying out the study under this section, the Administrator shall—
(1) consult with other Federal agencies, State, local, and Tribal governments, owners and operators of publicly owned treatment works, and stakeholder organizations, including organizations with experience in investigating or addressing the wastewater infrastructure needs of rural communities, economically disadvantaged communities, and Tribal communities;
(2) undertake at least one public meeting in a rural community, in an economically disadvantaged community, and in a Tribal community, to receive testimony from the public;
(3) examine whether the distribution of wastewater infrastructure funds during the period covered by the study has been in accordance with any applicable executive order or policy regarding environmental justice;
(4) examine how wastewater infrastructure funds have been distributed with respect to the identified needs of rural communities, economically disadvantaged communities, and Tribal communities, and whether such funds have addressed the needs of such communities equitably when compared to how such funds have been distributed with respect to the identified needs of communities that are not rural, economically disadvantaged, or Tribal; and
(5) consider any additional factors that the Administrator determines necessary or appropriate to determine whether rural communities, economically disadvantaged communities, and Tribal communities have equitable access to wastewater infrastructure funds to comply with applicable requirements of the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.).
(c) Report to Congress.—Not later than 2 years after the date of enactment of this Act, the Administrator shall submit to Congress a report describing—
(2) any recommendations to Congress, or to State, local, and Tribal governments, to ensure that rural communities, economically disadvantaged communities, and Tribal communities can equitably access wastewater infrastructure funds in amounts sufficient to address local wastewater infrastructure needs and local water quality challenges.
(d) Definitions.—In this section:
(1) ECONOMICALLY DISADVANTAGED COMMUNITY.—The term “economically disadvantaged community” means—
(A) a municipality that meets the affordability criteria of a State established under section 603(i)(2) of the Federal Water Pollution Control Act (33 U.S.C. 1383(i)(2));
(B) a community with respect to which a municipality can demonstrate that households in the community experience significant economic hardship related to wastewater infrastructure; or
(C) a community that is located in an area that meets the criteria described in paragraph (1) or (2) of section 301(a) of the Public Works and Economic Development Act of 1965 (42 U.S.C. 3161(a)).
(2) MUNICIPALITY; TREATMENT WORKS.—The terms “municipality” and “treatment works” have the meanings given those terms in section 502 of the Federal Water Pollution Control Act (33 U.S.C. 1362).
(3) WASTEWATER INFRASTRUCTURE FUNDS.—The term “wastewater infrastructure funds” means funds made available for projects or activities under or pursuant to—
(A) title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et seq.);
(B) section 122 of the Federal Water Pollution Control Act (33 U.S.C. 1274);
(C) section 220 of the Federal Water Pollution Control Act (33 U.S.C. 1300); and
(D) section 221 of the Federal Water Pollution Control Act (33 U.S.C. 1301).
(a) In general.—Not later than 180 days after the date of enactment of this Act, the Administrator shall establish a Water Reuse Interagency Working Group to develop and coordinate actions, tools, and resources to encourage water reuse across the United States, including through the implementation of the National Water Reuse Action Plan, consistent with the mission of each Federal agency that is a member of the working group.
(c) Duties of the working group.—The working group shall—
(2) encourage the consideration of water reuse as part of integrated water resources management and planning;
(3) conduct, and submit to Congress and make public, an assessment of opportunities to encourage water reuse and actions necessary to pursue such opportunities;
(d) Report.—Not less frequently than once every 2 years, the Administrator shall submit to Congress a report on the activities and findings of the working group.
(e) Sunset.—The working group shall terminate on the date that is 6 years after the date of enactment of this Act.
(f) Definitions.—In this section:
(1) ADMINISTRATOR.—The term “Administrator” means the Administrator of the Environmental Protection Agency.
(2) NATIONAL WATER REUSE ACTION PLAN.—The term “National Water Reuse Action Plan” means the document published by the Administrator entitled “National Water Reuse Action Plan: Collaborative Implementation (Version 1)”, dated February 2020, and noticed in the Federal Register on March 3, 2020 (85 Fed. Reg. 12552), as updated pursuant to this section.
Union Calendar No. 48 | |||||
| |||||
[Report No. 117–69] | |||||
A BILL | |||||
To amend the Federal Water Pollution Control Act to reauthorize certain water pollution control programs, and for other purposes. | |||||
June 22, 2021 | |||||
Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed |