To amend the United States Energy Storage Competitiveness Act of 2007 to establish a research, development, and demonstration program for grid-scale energy storage systems, and for other purposes.
May 22, 2019
Ms. Collins (for herself, Mr. Heinrich, Ms. Smith, Mr. Gardner, Mr. Coons, Ms. McSally, Mr. King, Mr. Crapo, Ms. Stabenow, Ms. Hirono, Mr. Manchin, Ms. Klobuchar, Ms. Hassan, Mr. Whitehouse, Mr. Reed, Ms. Cortez Masto, Mr. Wyden, Ms. Duckworth, and Ms. Murkowski) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
October 22, 2019
Reported by Ms. Murkowski, with an amendment and an amendment to the title
[Strike out all after the enacting clause and insert the part printed in italic]
To amend the United States Energy Storage Competitiveness Act of 2007 to establish a research, development, and demonstration program for grid-scale energy storage systems, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
This Act may be cited as the “Better Energy Storage Technology Act” or the “BEST Act”.
SEC. 2. Grid-scale energy storage system research, development, and demonstration program.
(a) In general.—The United States Energy Storage Competitiveness Act of 2007 (42 U.S.C. 17231) is amended—
(1) by redesignating subsections (l) through (p) as subsections (m) through (q), respectively; and
(2) by inserting after subsection (k) the following:
“(l) Grid-Scale energy storage system research, development, and demonstration program.—
“(1) DEFINITIONS.—In this subsection:
“(A) ENERGY STORAGE SYSTEM.—The term ‘energy storage system’ means a system, equipment, facility, or technology that—
“(i) is capable of absorbing energy, storing that energy for a period of time, and dispatching the stored energy; and
“(ii) (I) uses a mechanical, electrical, chemical, electrochemical, or thermal process to store energy that—
“(aa) was generated at an earlier time for use at a later time; or
“(bb) was generated from a mechanical process, and would otherwise be wasted, for delivery at a later time; or
“(II) stores thermal energy for direct use for heating or cooling at a later time in a manner that avoids the need to use electricity at that later time, in the same manner as the storage and use offered by a grid-enabled water heater.
“(B) PROGRAM.—The term ‘program’ means the research, development, and demonstration program established under paragraph (2)(A).
“(A) IN GENERAL.—Not later than 180 days after the date of enactment of the BEST Act, the Secretary shall establish within the Office of Electricity of the Department of Energy a research, development, and demonstration program of grid-scale energy storage systems, in accordance with this subsection.
“(B) GOALS, PRIORITIES, COST TARGETS.—The Secretary shall develop goals, priorities, and cost targets for the program.
“(A) IN GENERAL.—Not later than 180 days after the date of enactment of the BEST Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Science, Space, and Technology of the House of Representatives a 10-year strategic plan for the program.
“(B) CONTENTS.—The strategic plan submitted under subparagraph (A) shall—
“(i) identify Department of Energy programs that—
“(I) support the research and development activities described in paragraph (4) and the demonstration projects under paragraph (6); and
“(II) (aa) do not support the activities or projects described in subclause (I); but
“(bb) are important to the development of grid-scale energy storage systems and the mission of the Office of Electricity of the Department of Energy, as determined by the Secretary; and
“(ii) include expected timelines for—
“(I) the accomplishment of relevant objectives under current programs of the Department of Energy relating to grid-scale energy storage systems; and
“(II) the commencement of any new initiatives within the Department of Energy relating to grid-scale energy storage systems to accomplish those objectives.
“(C) UPDATES TO PLAN.—Not less frequently than once every 2 years, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Science, Space, and Technology of the House of Representatives an updated 10-year strategic plan, which shall identify, and provide a justification for, any major deviation from a previous strategic plan submitted under this paragraph.
“(4) RESEARCH AND DEVELOPMENT.—In carrying out the program, the Secretary shall focus research and development activities on developing cost-effective energy storage systems that—
“(A) (i) to balance day-scale needs, are capable of highly flexible power output for not less than 6 hours; and
“(I) not less than 8,000 cycles of discharge at full output; and
“(II) 20 years of operation;
“(B) (i) can provide power to the electric grid for durations of approximately 10 to 100 hours; and
“(I) not less than 1,500 cycles of discharge at full output; and
“(II) 20 years of operation; and
“(C) can store energy over several months and address seasonal scale variations in supply and demand.
“(A) IN GENERAL.—Cost targets developed by the Secretary under paragraph (2)(B) shall—
“(i) be for energy storage costs across all types of energy storage technology; and
“(ii) include technology costs, installation costs, balance of services costs, and soft costs.
“(B) TARGET UPDATES; SUBTARGETS.—Not less frequently than once every 5 years during the 10-year period beginning on the date of enactment of the BEST Act, the Secretary shall—
“(i) revise the cost targets developed under paragraph (2)(B) to be more stringent, based on—
“(I) a technology-neutral approach that considers all types of energy storage deployment scenarios, including individual technologies, technology combination use profiles, and integrated control system applications;
“(II) input from a variety of stakeholders, including the stakeholders described in subsection (i)(3);
“(III) the inclusion and use of existing infrastructure; and
“(IV) the ability to optimize the integration of intermittent renewable energy generation technology and distributed energy resources; and
“(ii) establish cost subtargets for technologies and applications relating to the energy storage systems described in paragraph (4), taking into consideration—
“(I) electricity market prices; and
“(II) the goal of being cost-competitive in specific markets for electric grid products and services.
“(A) IN GENERAL.—Not later than September 30, 2023, under the program, the Secretary shall, to the maximum extent practicable, enter into agreements to carry out not more than 5 grid-scale energy storage system demonstration projects.
“(B) OBJECTIVES.—Each demonstration project carried out under subparagraph (A) shall be designed to further the development of the energy storage systems described in paragraph (4).
“(C) NO PROJECT OWNERSHIP INTEREST.—The Federal Government shall not hold any equity or other ownership interest in any grid-scale energy storage system that is part of a demonstration project under this paragraph.
“(7) TESTING AND VALIDATION.—The Secretary shall accelerate the standardized testing and validation of grid-scale energy storage systems under the program through collaboration with one or more National Laboratories (as defined in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801)), including by developing testing and evaluation methodologies for—
“(A) standardized grid performance testing for energy storage systems, materials, and technologies during each stage of development, beginning with the research stage and ending with the deployment stage, including performance testing with charge and discharge protocols to evaluate power capability, energy output, and degradation during cycling and calendar aging on earliest stage commercially viable prototypes (commonly less than 100 kilowatts); and
“(B) accelerated life testing protocols to predict estimated lifetime metrics with accuracy.
“(8) COORDINATION.—To accelerate the development of grid-scale energy storage systems under the program, and pursuant to subsection (n), the Secretary shall coordinate with—
“(A) offices within the Department of Energy conducting energy storage research, such as the Advanced Research Projects Agency–Energy, the Office of Science, and the Office of Energy Efficiency and Renewable Energy;
“(B) Federal agencies that are carrying out initiatives to increase energy security or reliability, such as the Department of Defense, the National Science Foundation, the Federal Energy Regulatory Commission, and the Department of Homeland Security;
“(C) program offices that aim to increase domestic manufacturing and production, such as the Office of Advanced Manufacturing in the Department of Energy and the National Institute of Standards and Technology in the Department of Commerce; and
“(D) members of private industry to advance the development of commercially viable grid-scale energy storage systems.”.
(b) Authorization of appropriations.—The United States Energy Storage Competitiveness Act of 2007 (42 U.S.C. 17231) is amended, in subsection (q) (as redesignated by subsection (a)(1))—
(1) in paragraph (5), by striking “and” at the end;
(2) in paragraph (6), by striking the period at the end and inserting “; and”; and
(3) by adding at the end the following:
“(7) the research, development, and demonstration program of grid-scale energy storage systems under subsection (l) $60,000,000 for each of fiscal years 2020 through 2024.”.
This Act may be cited as the “Better Energy Storage Technology Act” or the “BEST Act”.
In this Act:
(2) ENERGY STORAGE SYSTEM.—The term “energy storage system” means any system, equipment, facility, or technology that—
(A) is capable of absorbing or converting energy, storing the energy for a period of time, and dispatching the energy; and
(3) NATIONAL LABORATORY.—The term “National Laboratory” has the meaning given the term in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801).
SEC. 3. ENERGY STORAGE SYSTEM RESEARCH, DEVELOPMENT, AND DEPLOYMENT PROGRAM.
(a) Establishment.—Not later than 180 days after the date of enactment of this Act, the Secretary shall establish a program, to be known as the “Energy Storage System Research, Development, and Deployment Program” (referred to in this section as the “program”).
(b) Initial program objectives.—The program shall focus on research, development, and deployment of—
(1) energy storage systems designed to further the development of technologies—
(3) transportation energy storage technologies and applications, including vehicle-grid integration;
(4) cost-effective systems and methods for—
(6) pumped hydroelectric energy storage systems to advance—
(c) Testing and validation.—In coordination with 1 or more National Laboratories, the Secretary shall accelerate the development, standardized testing, and validation of energy storage systems under the program by developing testing and evaluation methodologies for—
(1) storage technologies, controls, and power electronics for energy storage systems under a variety of operating conditions;
(d) Periodic evaluation of program objectives.—Not less frequently than once every calendar year, the Secretary shall evaluate and, if necessary, update the program objectives to ensure that the program continues to advance energy storage systems toward widespread commercial deployment by lowering the costs and increasing the duration of energy storage resources.
(e) Energy storage strategic plan.—
(1) IN GENERAL.—The Secretary shall develop a 10-year strategic plan for the program, and update the plan, in accordance with this subsection.
(2) CONTENTS.—The strategic plan developed under paragraph (1) shall—
(C) identify Department programs that—
(3) SUBMISSION TO CONGRESS.—Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committees on Energy and Commerce and Science, Space, and Technology of the House of Representatives the strategic plan developed under paragraph (1).
(f) Leveraging of resources.—The program may be led by a specific office of the Department, but shall be cross-cutting in nature, so that in carrying out activities under the program, the Secretary (or a designee of the Secretary charged with leading the program) shall leverage existing Federal resources, including, at a minimum, the expertise and resources of—
(2) the Office of Energy Efficiency and Renewable Energy, including the Water Power Technologies Office; and
(4) the Electricity Storage Research Initiative established under section 975 of the Energy Policy Act of 2005 (42 U.S.C. 16315).
(g) Protecting privacy and security.—In carrying out this section, the Secretary shall identify, incorporate, and follow best practices for protecting the privacy of individuals and businesses and the respective sensitive data of the individuals and businesses, including by managing privacy risk and implementing the Fair Information Practice Principles of the Federal Trade Commission for the collection, use, disclosure, and retention of individual electric consumer information in accordance with the Office of Management and Budget Circular A–130 (or successor circulars).
SEC. 4. Energy storage demonstration projects; pilot grant program.
(a) Demonstration projects.—Not later than September 30, 2023, the Secretary shall, to the maximum extent practicable, enter into agreements to carry out not fewer than 5 energy storage system demonstration projects, including at least 1 energy storage system demonstration project designed to further the development of technologies described in subparagraph (E) or (F) of section 3(b)(1).
(b) Energy storage pilot grant program.—
(1) DEFINITION OF ELIGIBLE ENTITY.—In this subsection, the term “eligible entity” means—
(A) a State energy office (as defined in section 124(a) of the Energy Policy Act of 2005 (42 U.S.C. 15821(a)));
(B) an Indian tribe (as defined in section 4 of the Native American Housing Assistance and Self-Determination Act of 1996 (25 U.S.C. 4103);
(D) an institution of higher education (as defined in section 101 of the Higher Education Act of 1965 (20 U.S.C. 1001));
(E) an electric utility, including—
(F) a private energy storage company that is a small business concern (within the meaning of section 3 of the Small Business Act (15 U.S.C. 632)).
(2) ESTABLISHMENT.—The Secretary shall establish a competitive grant program under which the Secretary shall award grants to eligible entities to carry out demonstration projects for pilot energy storage systems.
(3) SELECTION REQUIREMENTS.—In selecting eligible entities to receive a grant under paragraph (2), the Secretary shall, to the maximum extent practicable—
(A) ensure regional diversity among eligible entities awarded grants, including ensuring participation of eligible entities that are rural States and States with high energy costs;
(4) OBJECTIVES.—Each demonstration project carried out by a grant awarded under paragraph (2) shall have 1 or more of the following objectives:
(B) To improve the reliability of transmission and distribution systems, particularly in rural areas, including high-energy-cost rural areas.
(C) To optimize transmission or distribution system operation and power quality to defer or avoid costs of replacing or upgrading electric grid infrastructure, including transformers and substations.
(D) To supply energy at peak periods of demand on the electric grid or during periods of significant variation of electric grid supply.
SEC. 5. Long-duration demonstration initiative and joint program.
(a) Definitions.—In this section:
(1) DIRECTOR OF ARPA–E.—The term “Director of ARPA–E” has the meaning given the term in section 5012(a) of the America COMPETES Act (42 U.S.C. 16538(a)).
(2) DIRECTOR OF ESTCP.—The term “Director of ESTCP” means the Secretary of Defense, acting through the Director of the Environmental Security Technology Certification Program of the Department of Defense.
(3) INITIATIVE.—The term “Initiative” means the demonstration initiative established under subsection (b).
(b) Establishment of Initiative.—Not later than 180 days after the date of enactment of this Act, the Secretary shall establish a demonstration initiative composed of demonstration projects focused on the development of long-duration energy storage technologies.
(c) Selection of projects.—To the maximum extent practicable, in selecting demonstration projects to participate in the Initiative, the Secretary shall—
(d) Joint Program.—
(1) ESTABLISHMENT.—As part of the Initiative, the Secretary, in consultation with the Director of ESTCP, shall establish within the Department of Energy a joint program to carry out projects—
(2) MEMORANDUM OF UNDERSTANDING.—Not later than 200 days after the date of enactment of this Act, the Secretary shall enter into a memorandum of understanding with the Director of ESTCP to administer the Joint Program.
(3) INFRASTRUCTURE.—In carrying out the Joint Program, the Secretary and the Director of ESTCP shall—
(4) GOALS AND METRICS.—The Secretary and the Director of ESTCP shall develop goals and metrics for technological progress under the Joint Program consistent with energy resilience and energy security policies.
(5) SELECTION OF PROJECTS.—
(A) IN GENERAL.—To the maximum extent practicable, in selecting projects to participate in the Joint Program, the Secretary and the Director of ESTCP shall—
SEC. 6. Technical and planning assistance program.
(a) Definitions.—In this section:
(1) ELIGIBLE ENTITY.—The term “eligible entity” means—
(B) a political subdivision of a State, such as a municipally owned electric utility, or any agency, authority, corporation, or instrumentality of a State political subdivision;
(b) Establishment.—
(1) IN GENERAL.—The Secretary shall establish a technical and planning assistance program to assist eligible entities in identifying, evaluating, planning, designing, and developing processes to procure energy storage systems.
(2) ASSISTANCE AND GRANTS.—Under the program, the Secretary shall—
(c) Technical and planning assistance.—
(1) IN GENERAL.—Technical and planning assistance provided under the program shall include assistance with 1 or more of the following activities relating to energy storage systems:
(2) EXCLUSION.—Technical and planning assistance provided under the program shall not be used to pay any person for influencing or attempting to influence an officer or employee of any Federal, State, or local agency, a Member of Congress, an employee of a Member of Congress, a State or local legislative body, or an employee of a State or local legislative body.
(d) Information dissemination.—The information disseminated under subsection (b)(2)(A) shall include—
(1) information relating to the topics described in subsection (c)(1), including case studies of successful examples;
(2) computational tools or software for assessment, design, and operation and maintenance of energy storage systems;
(e) Applications.—
(f) Reports.—The Secretary shall submit to Congress and make available to the public—
(g) Cost-sharing.—Activities under this section shall be subject to the cost-sharing requirements under section 988 of the Energy Policy Act of 2005 (42 U.S.C. 16352).
SEC. 7. Energy storage materials recycling prize competition.
Section 1008 of the Energy Policy Act of 2005 (42 U.S.C. 16396) is amended by adding at the end the following:
“(g) Energy Storage Materials Recycling Prize Competition.—
“(1) DEFINITION OF CRITICAL ENERGY STORAGE MATERIALS.—In this subsection, the term ‘critical energy storage materials’ includes—
“(2) PRIZE AUTHORITY.—
“(A) IN GENERAL.—As part of the program established under subsection (a), the Secretary shall establish an award program, to be known as the ‘Energy Storage Materials Recycling Prize Competition’ (referred to in this subsection as the ‘program’), under which the Secretary shall carry out prize competitions and make awards to advance the recycling of critical energy storage materials.
“(3) ELIGIBILITY.—
“(A) IN GENERAL.—To be eligible to win a prize under the program, an individual or entity—
“(i) shall have complied with the requirements of the competition as described in the announcement for that competition published in the Federal Register by the Secretary under paragraph (6);
“(4) AWARDS.—In carrying out the program, the Secretary shall award cash prizes, in amounts to be determined by the Secretary, to each individual or entity selected through a competitive process to develop advanced methods or technologies to recycle critical energy storage materials from energy storage systems.
“(5) CRITERIA.—
“(A) IN GENERAL.—The Secretary shall establish objective, merit-based criteria for awarding the prizes in each competition carried out under the program.
“(6) ADVERTISING AND SOLICITATION OF COMPETITORS.—
“(A) IN GENERAL.—The Secretary shall announce each prize competition under the program by publishing a notice in the Federal Register.
“(7) JUDGES.—
“(A) IN GENERAL.—For each prize competition under the program, the Secretary shall assemble a panel of qualified judges to select the winner or winners of the competition on the basis of the criteria established under paragraph (5).
“(B) SELECTION.—The judges for each competition shall include appropriate members of private industry involved in the commercial deployment of energy storage systems.
“(C) CONFLICTS.—An individual may not serve as a judge in a prize competition under the program if the individual, the spouse of the individual, any child of the individual, or any other member of the household of the individual—
“(8) REPORT TO CONGRESS.—Not later than 60 days after the date on which the first prize is awarded under the program, and annually thereafter, the Secretary shall submit to Congress a report that—
SEC. 8. Regulatory actions to encourage energy storage deployment.
(b) Regulatory action.—
(1) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Commission shall issue a regulation to identify the eligibility of, and process for, electric storage resources—
(c) Electric storage resources technical conference.—
(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, the Commission shall convene a technical conference on the potential for electric storage resources to improve the operation of electric systems.
(2) REQUIREMENTS.—The technical conference under paragraph (1) shall—
(A) identify opportunities for further consideration of electric storage resources in regional and interregional transmission planning processes within the jurisdiction of the Commission;
To the maximum extent practicable, the Secretary shall coordinate the activities under this Act (including activities conducted pursuant to the amendments made by this Act) among the offices and employees of the Department, other Federal agencies, and other relevant entities—
SEC. 10. Authorization of appropriations.
There are authorized to be appropriated—
(1) to carry out section 3, $100,000,000 for each of fiscal years 2020 through 2024, to remain available until expended;
(2) to carry out section 4, $100,000,000 for each of fiscal years 2020 through 2024, to remain available until expended;
Amend the title so as to read: “A bill to support research, development, and demonstration programs relating to energy storage systems, and for other purposes.”.
Calendar No. 255 | |||||
| |||||
[Report No. 116–135] | |||||
A BILL | |||||
To amend the United States Energy Storage Competitiveness Act of 2007 to establish a research,
development, and demonstration program for grid-scale energy storage
systems, and for other purposes. | |||||