Union Calendar No. 548
115th CONGRESS 2d Session |
[Report No. 115–708]
To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes.
May 18, 2018
Mr. Shuster (for himself, Mr. DeFazio, Mr. Graves of Louisiana, and Mrs. Napolitano) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure
June 1, 2018
Additional sponsors: Mr. Duncan of Tennessee, Ms. Esty of Connecticut, Mr. LoBiondo, Mr. Larsen of Washington, Mr. Hunter, Mr. Garamendi, Mr. Graves of Missouri, Ms. Norton, Mr. Denham, Mr. Capuano, Mr. Barletta, Ms. Eddie Bernice Johnson of Texas, Mr. Gibbs, Mr. Cummings, Mr. Sanford, Mr. Lipinski, Mr. Rouzer, Mr. Nolan, Mr. Weber of Texas, Mrs. Bustos, Mr. Mitchell, Ms. Brownley of California, Mr. Faso, Ms. Wilson of Florida, Mr. Ferguson, Mr. Payne, Mr. Lowenthal, Mrs. Lawrence, and Mr. DeSaulnier
June 1, 2018
Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed
[Strike out all after the enacting clause and insert the part printed in italic]
[For text of introduced bill, see copy of bill as introduced on May 18, 2018]
To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
(b) Table of contents.—The table of contents for this Act is as follows:
Sec. 1. Short title; table of contents.
Sec. 2. Secretary defined.
Sec. 101. Sense of Congress regarding water resources development bills.
Sec. 102. Use of Harbor Maintenance Trust Fund to support navigation.
Sec. 103. Assessment of harbors and inland harbors.
Sec. 104. Levee safety initiative reauthorization.
Sec. 105. Dam safety.
Sec. 106. Rehabilitation of Corps of Engineers constructed dams.
Sec. 107. Forecast-informed reservoir operations.
Sec. 108. Identification of nonpowered dams for hydropower development.
Sec. 109. Emergency response to natural disasters.
Sec. 110. Integrated water resources planning.
Sec. 111. Mitigation banks.
Sec. 112. Indian Tribes.
Sec. 113. Columbia River.
Sec. 114. Dissemination of information.
Sec. 115. Non-Federal engagement and review.
Sec. 116. Comprehensive backlog report.
Sec. 117. Structures and facilities constructed by Secretary.
Sec. 118. Transparency in administrative expenses.
Sec. 119. Study of the future of the United States Army Corps of Engineers.
Sec. 120. Acknowledgment of credit.
Sec. 121. Non-Federal implementation pilot program.
Sec. 122. Study of water resources development projects by non-Federal interests.
Sec. 123. Construction of water resources development projects by non-Federal interests.
Sec. 124. Advanced funds for water resources development studies and projects.
Sec. 125. Funding to process permits.
Sec. 126. Study on economic and budgetary analyses.
Sec. 127. Study of corrosion management at Corps of Engineers projects.
Sec. 128. Costs in excess of Federal participation limit.
Sec. 129. Report on innovative materials.
Sec. 130. Study on Corps of Engineers.
Sec. 131. GAO study.
Sec. 132. GAO report on Alaska Native village relocation efforts due to flooding and erosion threats.
Sec. 133. Study and report on expediting certain waiver processes.
Sec. 134. Corps of Engineers continuing authorities program.
Sec. 135. Credit in lieu of reimbursement.
Sec. 136. Lake Okeechobee regulation schedule review.
Sec. 137. Missouri River.
Sec. 138. Access to real estate data.
Sec. 139. Aquatic invasive species research.
Sec. 140. Harmful algal bloom technology demonstration.
Sec. 141. Bubbly Creek, Chicago ecosystem restoration.
Sec. 142. Operation and maintenance of navigation and hydroelectric facilities.
Sec. 143. Hurricane and storm damage reduction.
Sec. 144. Post-disaster watershed assessments in the territories of the United States.
Sec. 201. Authorization of proposed feasibility studies.
Sec. 202. Additional studies.
Sec. 203. Expedited completion of reports for certain projects.
Sec. 301. Deauthorization of inactive projects.
Sec. 302. Backlog prevention.
Sec. 303. Project modifications.
Sec. 304. Milwaukee Harbor, Milwaukee, Wisconsin.
Sec. 305. Bridgeport Harbor, Connecticut.
Sec. 306. Conveyances.
Sec. 307. Clatsop County, Oregon.
Sec. 308. Kissimmee River Restoration, Central and Southern Florida.
Sec. 309. Lytle and Cajon Creeks, California.
Sec. 310. Yuba River Basin, California.
Sec. 401. Project authorizations.
It is the sense of Congress that, because the missions of the Corps of Engineers for navigation, flood control, beach erosion control and shoreline protection, hydroelectric power, recreation, water supply, environmental protection, restoration, and enhancement, and fish and wildlife mitigation benefit all Americans, and because water resources development projects are critical to maintaining the country’s economic prosperity, national security, and environmental protection, Congress should consider a water resources development bill not less often than once every Congress.
(a) Availability of amounts.—Section 210 of the Water Resources Development Act of 1986 (33 U.S.C. 2238) is amended—
(1) in the section heading by striking “Authorization of appropriations” and inserting “Funding for harbor navigation”;
(2) by redesignating subsections (c), (d), (e), and (f) as subsections (d), (e), (f), and (g), respectively; and
(3) by inserting after subsection (b) the following:
“(c) Use of collected funds in fiscal year 2029 and thereafter.—
“(1) USE OF FUNDS.—In addition to amounts appropriated under subsections (a) and (b), there shall be available to the Secretary, out of the Harbor Maintenance Trust Fund, without further appropriation, for fiscal year 2029 and each fiscal year thereafter, such sums as may be necessary to carry out the purposes of subsection (a)(2).
(b) Conforming amendments.—Section 210 of the Water Resources Development Act of 1986 (33 U.S.C. 2238) is further amended—
(1) in subsection (d)(2)(A)(i) (as redesignated by subsection (a)(2) of this section) by striking “subsection (e)” and inserting “subsection (f)”;
Subsection (f) of section 210 of the Water Resources Development Act of 1986 (33 U.S.C. 2238), as redesignated by section 102, is amended—
(1) in paragraph (1), by striking “shall assess the” and inserting “shall assess, and issue a report to Congress on, the”; and
(2) in paragraph (2), by adding at the end the following:
“(C) OPPORTUNITIES FOR BENEFICIAL USE OF DREDGED MATERIALS.—In carrying out paragraph (1), the Secretary shall identify potential opportunities for the beneficial use of dredged materials obtained from harbors and inland harbors referred to in subsection (a)(2), including projects eligible under section 1122 of the Water Resources Development Act of 2016 (130 Stat. 1645; 33 U.S.C. 2326 note).”.
Title IX of the Water Resources Development Act of 2007 (33 U.S.C. 3301 et seq.) is amended—
Section 14 of the National Dam Safety Program Act (33 U.S.C. 467j) is amended by striking “2015 through 2019” each place it appears and inserting “2019 through 2023”.
Section 1177 of the Water Resources Development Act of 2016 (33 U.S.C. 467f–2 note) is amended—
(a) Report on forecast-Informed reservoir operations.—Not later than one year after the date of completion of the forecast-informed reservoir operations research study pilot program at Coyote Valley Dam, Russian River Basin, California (authorized by the River and Harbor Act of 1950 (64 Stat. 177)), the Secretary shall issue a report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate on the results of the study pilot program.
(b) Contents of report.—The Secretary shall include in the report issued under subsection (a)—
(1) an analysis of the use of forecast-informed reservoir operations at Coyote Valley Dam, California;
(2) an assessment of the viability of using forecast-informed reservoir operations at other dams owned or operated by the Secretary;
(a) In general.—Not later than 18 months after the date of enactment of this section, the Secretary shall develop a list of existing nonpowered dams owned and operated by the Corps of Engineers that have the greatest potential for hydropower development.
(a) In general.—Section 5(a)(1) of the Act of August 18, 1941 (33 U.S.C. 701n(a)(1)) is amended in the first sentence—
(1) by striking “strengthening, raising, extending, or other modification thereof” and inserting “strengthening, raising, extending, realigning, or other modification thereof”; and
(2) by striking “structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to the design level of protection when, in the discretion of the Chief of Engineers,” and inserting “structure or project damaged or destroyed by wind, wave, or water action of other than an ordinary nature to either the pre-storm level or the design level of protection, whichever provides greater protection, when, in the discretion of the Chief of Engineers,”.
In carrying out a water resources development feasibility study, the Secretary shall consult with local governments in the watershed covered by such study to determine if local water management plans exist, or are under development, for the purposes of stormwater management, water quality improvement, aquifer recharge, or water reuse.
(a) Definition of mitigation bank.—In this section, the term “mitigation bank” has the meaning given that term in section 332.2 of title 33, Code of Federal Regulations.
(b) Guidance.—The Secretary shall issue guidance on the use of mitigation banks to meet requirements for water resources development projects in order to update mitigation bank credit release schedules to—
(c) Requirements.—The guidance issued under subsection (b) shall—
(1) be consistent with—
(B) section 906 of the Water Resources Development Act of 1986 (33 U.S.C. 2283);
(D) section 314(b) of the National Defense Authorization Act for Fiscal Year 2004 (Public Law 108–136; 33 U.S.C. 1344 note); and
(2) provide for—
(A) the mitigation bank sponsor to provide sufficient financial assurances to ensure a high level of confidence that the compensatory mitigation project will be successfully completed, in accordance with applicable performance standards, under section 332.3(n) of title 33, Code of Federal Regulations;
(a) Cost sharing provisions for the territories and Indian Tribes.—Section 1156(a)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 2310(a)(2)) is amended by striking “section 102 of the Federally Recognized Indian Tribe List Act of 1994 (25 U.S.C. 5130)” and inserting “section 4(e) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304(e))”.
(b) Written agreement requirement for water resources projects.—Section 221(b)(1) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(b)(1)) is amended by striking “a federally recognized Indian tribe and, as defined in section 3 of the Alaska Native Claims Settlement Act (43 U.S.C. 1602), a Native village, Regional Corporation, and Village Corporation” and inserting “an Indian tribe, as defined in section 4(e) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304(e))”.
(a) Bonneville Dam, Oregon.—Section 1178(c)(1)(A) of the Water Resources Development Act of 2016 (130 Stat. 1675) is amended by striking “may provide assistance” and inserting “may provide assistance, which may include housing and related improvements,”.
(b) John Day Dam, Washington and Oregon.—
(1) IN GENERAL.—The Secretary shall, not later than 180 days after the date of enactment of this Act, and in consultation with the Secretary of the Interior, conduct a study to determine the extent to which Indian Tribes have been displaced as a result of the construction of the John Day Dam, Columbia River, Washington and Oregon, as authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 179), including an assessment of effects related to housing and related improvements.
(2) ADDITIONAL ACTIONS.—If the Secretary determines, based on the study under paragraph (1), that assistance is required, the Secretary may use all existing authorities of the Secretary to provide assistance, which may include housing and related improvements, to Indian Tribes displaced as a result of the construction of the John Day Dam, Columbia River, Washington and Oregon.
(c) The Dalles Dam, Washington and Oregon.—The Secretary, in consultation with the Secretary of the Interior, shall complete a village development plan for any Indian Tribe displaced as a result of the construction of the Dalles Dam, Columbia River, Washington and Oregon, as authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 179).
(a) Findings.—Congress finds the following:
(1) Congress plays a central role in identifying, prioritizing, and authorizing vital water resources infrastructure activities throughout the United States.
(2) The Water Resources Reform and Development Act of 2014 (Public Law 113–121) established a new and transparent process to review and prioritize the water resources development activities of the Corps of Engineers with strong congressional oversight.
(3) Section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) requires the Secretary to develop and submit to Congress each year a Report to Congress on Future Water Resources Development and, as part of the annual report process, to—
(4) Congress will use the information provided in the annual Report to Congress on Future Water Resources Development to determine authorization needs and priorities for purposes of water resources development legislation.
(5) To ensure that Congress can gain a thorough understanding of the water resources development needs and priorities of the United States, it is important that the Secretary take sufficient steps to ensure that non-Federal interests are made aware of the new annual report process, including the need for non-Federal interests to submit proposals during the Secretary’s annual request for proposals in order for such proposals to be eligible for consideration by Congress.
(b) Dissemination of process information.—The Secretary shall develop, support, and implement education and awareness efforts for non-Federal interests with respect to the annual Report to Congress on Future Water Resources Development required under section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d), including efforts to—
(1) develop and disseminate technical assistance materials, seminars, and guidance on the annual process as it relates to non-Federal interests;
(2) provide written notice to local elected officials and previous and potential non-Federal interests on the annual process and on opportunities to address local water resources challenges through the missions and authorities of the Corps of Engineers;
(a) Public notice.—
(1) IN GENERAL.—Prior to developing and issuing any new or revised implementation guidance for a covered water resources development law, the Secretary shall issue a public notice that—
(b) Stakeholder engagement.—
(c) Development of guidance.—When developing implementation guidance for a covered water resources development law, the Secretary shall take into consideration the input and recommendations received from non-Federal stakeholders, and make the final guidance available to the public on-line on a publicly accessible website.
Section 1001(b)(4) of the Water Resources Development Act of 1986 (33 U.S.C. 579a(b)(4)) is amended—
(4) by redesignating subparagraph (C) as subparagraph (D) and inserting after subparagraph (B) the following:
“(C) REQUIRED OPERATION AND MAINTENANCE INFORMATION.—The Secretary shall include on the list developed under subparagraph (A)(ii), for each project and property under the control of the Corps of Engineers on that list—
“(i) the authority under which the project was authorized or the property was acquired by the Corps of Engineers;
(5) in subparagraph (D), as so redesignated—
(A) in clause (i), in the matter preceding subclause (I), by striking “Not later than 1 year after the date of enactment of this paragraph, the Secretary shall submit a copy of the list” and inserting “For fiscal year 2019, and biennially thereafter, in conjunction with the President’s annual budget submission to Congress under section 1105(a) of title 31, United States Code, the Secretary shall submit a copy of the lists”; and
Section 14 of the Act of March 3, 1899 (33 U.S.C. 408) is amended by adding at the end the following:
“(d) Work defined.—For the purposes of this section, the term ‘work’ shall not include unimproved real estate owned or operated by the Secretary as part of a water resources development project if the Secretary determines that modification of such real estate would not affect the function and usefulness of the project.”.
Section 1012(b)(1) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2315a(b)(1)) is amended by striking “The Secretary” and inserting “Not later than 1 year after the date of enactment of the Water Resources Development Act of 2018, the Secretary”.
(a) In general.—The Secretary shall enter into an agreement with the National Academy of Sciences to convene a committee of experts to carry out a comprehensive study on—
(1) the ability of the Corps of Engineers to carry out its statutory missions and responsibilities, and the potential effects of transferring the functions (including regulatory obligations), personnel, assets, and civilian staff responsibilities of the Secretary relating to civil works from the Department of Defense to a new or existing agency or subagency of the Federal Government, including how such a transfer might affect the Federal Government’s ability to meet the current statutory missions and responsibilities of the Corps of Engineers; and
(2) improving the Corps of Engineers’ project delivery processes, including recommendations for such improvements, taking into account factors including—
(A) the effect of the annual appropriations process on the ability of the Corps of Engineers to efficiently secure and carry out contracts for water resources projects and perform regulatory obligations;
(b) Considerations.—The study carried out under subsection (a) shall include consideration of—
(c) Consultation.—The agreement entered into under subsection (a) shall require the National Academy to, in carrying out the study, consult with—
(d) Submission to Congress.—The Secretary shall submit the final report of the National Academy containing the findings of the study carried out under subsection (a) to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate not later than 2 years after the date of enactment of this Act.
Section 7007(a) of the Water Resources Development Act of 2007 (121 Stat. 1277; 128 Stat. 1226) is amended by adding at the end the following: “Notwithstanding section 221(a)(4)(C)(i) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)(C)(i)), the Secretary may provide credit for work carried out during the period beginning on November 8, 2007, and ending on the date of enactment of the Water Resources Development Act of 2018 by the non-Federal interest for a project under this title if the Secretary determines that the work is integral to the project and was carried out in accordance with the laws specified in section 5014(i)(2)(A) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1331) and all other applicable Federal laws.”.
Section 1043(b)(8) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2201 note(b)(8)) is amended by striking “2015 through 2019” and inserting “2019 through 2023”.
Section 203 of the Water Resources Development Act of 1986 (33 U.S.C. 2231) is amended—
(2) by amending subsection (c) to read as follows:
“(c) Submission to Congress.—
“(1) REVIEW AND SUBMISSION OF STUDIES TO CONGRESS.—Not later than 180 days after the date of receipt of a feasibility study of a project under subsection (a)(1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes—
(3) by amending subsection (e) to read as follows:
“(e) Review and technical assistance.—
“(1) REVIEW.—The Secretary may accept and expend funds provided by non-Federal interests to undertake reviews, inspections, certifications, and other activities that are the responsibility of the Secretary in carrying out this section.
“(2) TECHNICAL ASSISTANCE.—At the request of a non-Federal interest, the Secretary shall provide to the non-Federal interest technical assistance relating to any aspect of a feasibility study if the non-Federal interest contracts with the Secretary to pay all costs of providing such technical assistance.
Section 204 of the Water Resources Development Act of 1986 (33 U.S.C. 2232) is amended—
(1) in subsection (b)—
(A) in paragraph (1), in the matter preceding subparagraph (A), by inserting “federally authorized” before “water resources development project”;
(B) in paragraph (2)(A), by inserting “, except as provided in paragraph (3)” before the semicolon; and
(C) by adding at the end the following:
“(3) PERMIT EXCEPTION.—
“(A) IN GENERAL.—For a project described in subsection (a)(1) or subsection (a)(3), or a separable element thereof, with respect to which a written agreement described in subparagraph (B) has been entered into, a non-Federal interest that carries out a project under this section shall not be required to obtain any Federal permits or approvals that would not be required if the Secretary carried out the project or separable element unless significant new circumstances or information relevant to environmental concerns or compliance have arisen since development of the project recommendation.
“(B) WRITTEN AGREEMENT.—For purposes of this paragraph, a written agreement shall provide that the non-Federal interest shall comply with the same legal and technical requirements that would apply if the project or separable element were carried out by the Secretary, including all mitigation required to offset environmental impacts of the project or separable element as determined by the Secretary.
“(C) CERTIFICATIONS.—Notwithstanding subparagraph (A), if a non-Federal interest carrying out a project under this section would, in the absence of a written agreement entered into under this paragraph, be required to obtain a certification from a State under Federal law to carry out the project, such certification shall still be required if a written agreement is entered into with respect to the project under this paragraph.”; and
(2) in subsection (d)—
(a) Contributions by States and political subdivisions for immediate use on authorized flood-Control work; repayment.—The Act of October 15, 1940 (54 Stat. 1176; 33 U.S.C. 701h–1) is amended—
(1) by striking “a flood-control project duly adopted and authorized by law” and inserting “a federally authorized water resources development project,”;
(3) by striking “from appropriations which may be provided by Congress for flood-control work” and inserting “if appropriations are provided by Congress for such purpose”; and
(4) by adding at the end the following: “For purposes of this Act, the term ‘State’ means the several States, the District of Columbia, the commonwealths, territories, and possessions of the United States, and Indian tribes (as defined in section 4(e) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304(e))).”.
(b) No adverse effect on processes.—In implementing any provision of law that authorizes a non-Federal interest to provide, advance, or contribute funds to the Secretary for the development or implementation of a water resources development project (including sections 203 and 204 of the Water Resources Development Act of 1986 (33 U.S.C. 2231, 2232), section 5 of the Act of June 22, 1936 (33 U.S.C. 701h), and the Act of October 15, 1940 (33 U.S.C. 701h–1)), the Secretary shall ensure, to the maximum extent practicable, that the use by a non-Federal interest of such authorities does not adversely affect—
(c) Advances by private parties; repayment.—Section 11 of the Act of March 3, 1925 (Chapter 467; 33 U.S.C. 561) is repealed.
Section 214(a) of the Water Resources Development Act of 2000 (33 U.S.C. 2352(a)) is amended—
(a) In general.—Not later than 180 days after the date of enactment of this Act, the Secretary shall enter into an agreement with the National Academy of Sciences to—
(b) Considerations.—The study under subsection (a) shall include—
(1) an analysis of the current economic principles and analytical methodologies used by or applied to the Corps of Engineers in determining the total benefits and total costs during the formulation of, and plan selection for, a water resources development project;
(2) an analysis of improvements or alternatives to how the Corps of Engineers utilizes the National Economic Development, Regional Economic Development, Environmental Quality, and Other Social Effects accounts developed by the Institute for Water Resources of the Corps of Engineers in the formulation of, and plan selection for, such projects;
(3) an analysis of whether such principles and methodologies fully account for all of the potential benefits of project alternatives, including any reasonably associated benefits of such alternatives that are not contrary to law, Federal policy, or sound water resources management;
(c) Publication.—The agreement entered into under subsection (a) shall require the National Academy of Sciences to, not later than 30 days after the completion of the study—
(d) Sense of Congress on budgetary evaluation metrics and transparency.—It is the sense of Congress that the President, in the formulation of the annual budget request for the U.S. Army Corps of Engineers (Civil Works), should submit to Congress a budget that—
(1) aligns the assessment of the potential benefit-cost ratio for budgeting water resources development projects with that used by the Corps of Engineers during project plan formulation and evaluation pursuant to section 80 of the Water Resources Development Act of 1974 (42 U.S.C. 1962d–17); and
(a) In general.—Not later than 1 year after the date of enactment of this Act, the Comptroller General of the United States shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a study of corrosion management efforts at projects and properties under the control of the Corps of Engineers.
(b) Requirements.—The study under subsection (a) shall include—
(1) an analysis of—
(A) asset management protocols that are utilized by the Corps of Engineers, including protocols that examine both asset integrity and the integration of corrosion management efforts within the asset lifecycle, which includes the stages of design, manufacturing and construction, operation and maintenance, and decommissioning;
(B) available corrosion prevention technologies that may be used at projects and properties under the control of the Corps of Engineers;
(C) corrosion-related asset failures and the management protocols of the Corps of Engineers to incorporate lessons learned from such failures into work and management practices;
Section 14 of the Flood Control Act of 1946 (33 U.S.C. 701r) is amended by inserting “, and if such amount is not sufficient to cover the costs included in the Federal cost share for a project, as determined by the Secretary, the non-Federal interest shall be responsible for any such costs that exceed such amount” before the period at the end.
Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to Congress a report that describes activities conducted by the Corps of Engineers at centers of expertise, technology centers, technical centers, research and development centers, and similar facilities and organizations relating to the testing, research, development, identification, and recommended uses for innovative materials in water resources development projects.
Not later than 180 days after the date of enactment of this Act, the Comptroller General of the United States shall submit to Congress a report that—
(1) describes the capacity and preparedness of the Corps of Engineers workforce, including challenges related to diversity, recruitment, retention, retirements, credentialing, professional development, on-the-job training, and other readiness-related gaps in ensuring a fully prepared 21st century Corps of Engineers workforce; and
(a) In general.—Not later than 2 years after the date of enactment of this Act, the Comptroller General of the United States shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a study of the consideration by the Corps of Engineers of natural features and nature-based features in the study of the feasibility of projects for flood risk management, hurricane and storm damage reduction, and ecosystem restoration.
(b) Considerations.—The study under subsection (a) shall include—
(1) a description of guidance or instructions issued, and other measures taken, by the Secretary and the Chief of Engineers to consider natural features and nature-based features in project feasibility studies;
(2) an assessment of the costs, benefits, impacts, and trade-offs associated with natural features and nature-based features recommended by the Secretary for flood risk reduction, hurricane and storm damage reduction, and ecosystem restoration projects, and the effectiveness of those natural features and nature-based features;
(c) Definitions.—In this section, the terms “natural feature” and “nature-based feature” have the meanings given such terms in section 1184 of the Water Resources Development Act of 2016 (33 U.S.C. 2289a).
(a) Definition of Alaska Native village.—In this section, the term “Alaska Native village” means a Native village that has a Village Corporation (as those terms are defined in section 3 of the Alaska Native Claims Settlement Act (43 U.S.C. 1602)).
(b) Report.—The Comptroller General of the United States shall submit to Congress a report on efforts to relocate Alaska Native villages due to flooding and erosion threats that updates the report of the Comptroller General entitled “Alaska Native Villages: Limited Progress Has Been Made on Relocating Villages Threatened by Flooding and Erosion”, dated June 2009.
Not later than 1 year after the date of enactment of this Act, the Secretary shall complete and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report based on the results of a study on the best options available to the Secretary to implement the waiver process for the non-Federal cost share under section 116 of the Energy and Water Development and Related Agencies Appropriations Act, 2010 (Public Law 111–85; 123 Stat. 2851).
Section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) is amended—
Section 1022 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2225) is amended to read as follows:
“SEC. 1022. Credit in lieu of reimbursement.
“(a) Requests for credits.—With respect to an authorized flood damage reduction project, or separable element thereof, that has been constructed by a non-Federal interest under section 211 of the Water Resources Development Act of 1996 (33 U.S.C. 701b–13), or an authorized coastal navigation project that has been constructed by the Corps of Engineers pursuant to section 11 of the Act of March 3, 1925, before the date of enactment of the Water Resources Development Act of 2018, the Secretary may provide to the non-Federal interest, at the request of the non-Federal interest, a credit in an amount equal to the estimated Federal share of the cost of the project or separable element, in lieu of providing to the non-Federal interest a reimbursement in that amount.
The Secretary, acting through the Chief of Engineers, shall expedite completion of the Lake Okeechobee regulation schedule to coincide with the completion of the Herbert Hoover Dike project, and may consider all relevant aspects of the Comprehensive Everglades Restoration Plan described in section 601 of the Water Resources Development Act of 2000 (114 Stat. 2680).
(a) IRC report.—Not later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report regarding the impacts of interception-rearing complex construction on the navigation, flood control, and other authorized purposes set forth in the Missouri River Master Manual, and on the population recovery of the pallid sturgeon.
(a) In general.—As soon as is practicable, using available funds, the Secretary shall make publicly available, including on a publicly accessible website, information relating to all real property with respect to which the Corps of Engineers holds an interest. The information shall include standardized real estate plat descriptions and geospatial information.
(a) In General.—As part of the ongoing activities of the Engineer Research and Development Center to address the spread and impacts of aquatic invasive species, the Secretary shall undertake research on the management and eradication of aquatic invasive species, including Asian carp and zebra mussels.
(b) Locations.—In carrying out subsection (a), the Secretary shall work with Corps of Engineers district offices representing diverse geographical regions of the continental United States that are impacted by aquatic invasive species, such as the Atlantic, Pacific, and Gulf coasts and the Great Lakes.
(c) Report.—Not later than 180 days after the date of enactment of this section, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report recommending a plan to address the spread and impacts of aquatic invasive species.
(a) In general.—The Secretary, acting through the Engineer Research and Development Center of the Chief of Engineers, shall implement a 5-year harmful algal bloom technology development demonstration under the Aquatic Nuisance Research Program. To the extent practicable, the Corps of Engineers shall support research that will identify and develop improved strategies for early detection, prevention, and management techniques and procedures to reduce the occurrence and effects of harmful algal blooms in the Nation’s water resources.
The Secretary shall enter into a memorandum of understanding with the Administrator of the Environmental Protection Agency to facilitate ecosystem restoration activities at the South Fork of the South Branch of the Chicago River (commonly known as Bubbly Creek).
(a) In general.—Section 314 of the Water Resources Development Act of 1990 (33 U.S.C. 2321) is amended—
(2) in the first sentence, by striking “Activities currently performed” and inserting the following:
(3) in subsection (a) (as designated by paragraph (2)), by inserting “navigation or” before “hydroelectric”;
(b) Clerical amendment.—The table of contents contained in section 1(b) of the Water Resources Development Act of 1990 (104 Stat. 4604) is amended by striking the item relating to section 314 and inserting the following:
“Sec. 314. Operation and maintenance of navigation and hydroelectric facilities.”.
Section 156 of the Water Resources Development Act of 1976 (42 U.S.C. 1962d–5f) is amended in subsection (b)—
Section 3025 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2267b) is amended by adding at the end the following:
“(e) Assessments in the territories of the United States.—
“(1) IN GENERAL.—For any major disaster declared in the territories of the United States before the date of enactment of this subsection, all activities in the territory carried out or undertaken pursuant to the authorities described under this section shall be conducted at full Federal expense unless the President determines that the territory has the ability to pay the cost share for an assessment under this section without the use of non-Federal funds or loans.
“(2) TERRITORIES DEFINED.—In this subsection, the term ‘territories of the United States’ means those insular areas specified in section 1156(a)(1) of the Water Resources Development Act of 1986 (33 U.S.C. 2310(a)(1)).”.
The Secretary is authorized to conduct a feasibility study for the following projects for water resources development and conservation and other purposes, as identified in the reports titled “Report to Congress on Future Water Resources Development” submitted to Congress on March 17, 2017, and February 5, 2018, respectively, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed by Congress:
(2) SAN DIEGO RIVER, CALIFORNIA.—Project for flood risk management, navigation, and ecosystem restoration, San Diego, California.
(3) J. BENNETT JOHNSTON WATERWAY, LOUISIANA.—Project for navigation, J. Bennett Johnston Waterway, Louisiana.
(6) CHAUTAUQUA LAKE, NEW YORK.—Project for ecosystem restoration and flood risk management, Chautauqua, New York.
(a) Lower Mississippi River; Missouri, Kentucky, Tennessee, Arkansas, Mississippi, and Louisiana.—
(1) IN GENERAL.—The Secretary is authorized to carry out studies to determine the feasibility of habitat restoration for each of the eight reaches identified as priorities in the report prepared by the Secretary pursuant to section 402 of the Water Resources Development Act of 2000, titled “Lower Mississippi River Resource Assessment; Final Assessment In Response to Section 402 of WRDA 2000” and dated July 2015.
(b) St. Louis Riverfront, Meramec River Basin, Missouri and Illinois.—
(1) IN GENERAL.—The Secretary is authorized to carry out studies to determine the feasibility of a project for ecosystem restoration and flood risk management in Madison, St. Clair, and Monroe Counties, Illinois, St. Louis City, and St. Louis, Jefferson, Franklin, Gasconade, Maries, Phelps, Crawford, Dent, Washington, Iron, St. Francois, St. Genevieve, Osage, Reynolds, and Texas Counties, Missouri.
(a) Feasibility reports.—The Secretary shall expedite the completion of a feasibility study for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project:
(6) Project for flood control, water conservation, and related purposes, Coyote Valley Dam, California.
(b) Lower San Joaquin River, California.—In expediting completion of the second phase of the Lower San Joaquin River feasibility study under subsection (a)(8), the Secretary shall review and give priority to any plans and designs requested by non-Federal interests and incorporate such plans and designs into the Federal study if the Secretary determines that such plans and designs are consistent with Federal standards.
(c) Post-authorization change reports.—The Secretary shall expedite completion of a post-authorization change report for the following projects:
(d) Upper Mississippi River protection.—Section 2010 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1270) is amended by adding at the end the following:
“(d) Considerations.—In carrying out a disposition study with respect to the Upper St. Anthony Falls Lock and Dam, including a disposition study under section 216 of the Flood Control Act of 1970 (33 U.S.C. 549a), the Secretary may not complete such study until the Secretary considers, and issues a report to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate on—
(a) Purposes.—The purposes of this section are—
(1) to identify $3,000,000,000 in water resources development projects authorized by Congress that are no longer viable for construction due to—
(b) Interim deauthorization list.—
(1) IN GENERAL.—The Secretary shall develop an interim deauthorization list that identifies—
(A) each water resources development project, or separable element of a project, authorized for construction before November 8, 2007, for which—
(i) planning, design, or construction was not initiated before the date of enactment of this Act; or
(ii) planning, design, or construction was initiated before the date of enactment of this Act, but for which no funds, Federal or non-Federal, were obligated for planning, design, or construction of the project or separable element of the project during the current fiscal year or any of the 6 preceding fiscal years;
(B) each project or separable element identified and included on a list to Congress for deauthorization pursuant to section 1001(b)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 579a(b)(2)); and
(2) PUBLIC COMMENT AND CONSULTATION.—
(3) SUBMISSION TO CONGRESS; PUBLICATION.—Not later than 90 days after the date of the close of the comment period under paragraph (2), the Secretary shall—
(c) Final deauthorization list.—
(1) IN GENERAL.—The Secretary shall develop a final deauthorization list of water resources development projects, or separable elements of projects, from the revised interim deauthorization list described in subsection (b)(3).
(2) DEAUTHORIZATION AMOUNT.—
(A) PROPOSED FINAL LIST.—The Secretary shall prepare a proposed final deauthorization list of projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $3,000,000,000.
(B) DETERMINATION OF FEDERAL COST TO COMPLETE.—For purposes of subparagraph (A), the Federal cost to complete shall take into account any allowances authorized by section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280), as applied to the most recent project schedule and cost estimate.
(3) IDENTIFICATION OF PROJECTS.—
(A) SEQUENCING OF PROJECTS.—
(i) IN GENERAL.—The Secretary shall identify projects and separable elements of projects for inclusion on the proposed final deauthorization list according to the order in which the projects and separable elements of the projects were authorized, beginning with the earliest authorized projects and separable elements of projects and ending with the latest project or separable element of a project necessary to meet the aggregate amount under paragraph (2)(A).
(ii) FACTORS TO CONSIDER.—The Secretary may identify projects and separable elements of projects in an order other than that established by clause (i) if the Secretary determines, on a case-by-case basis, that a project or separable element of a project is critical for interests of the United States, based on the possible impact of the project or separable element of the project on public health and safety, the national economy, or the environment.
(B) APPENDIX.—The Secretary shall include as part of the proposed final deauthorization list an appendix that—
(4) PUBLIC COMMENT AND CONSULTATION.—
(5) SUBMISSION OF FINAL LIST TO CONGRESS; PUBLICATION.—Not later than 120 days after the date of the close of the comment period under paragraph (4), the Secretary shall—
(d) Deauthorization; Congressional review.—
(1) IN GENERAL.—After the expiration of the 180-day period beginning on the date of submission of the final deauthorization list and appendix under subsection (c), a project or separable element of a project identified in the final deauthorization list is hereby deauthorized, unless Congress passes a joint resolution disapproving the final deauthorization list prior to the end of such period.
(2) NON-FEDERAL CONTRIBUTIONS.—
(A) IN GENERAL.—A project or separable element of a project identified in the final deauthorization list under subsection (c) shall not be deauthorized under this subsection if, before the expiration of the 180-day period referred to in paragraph (1), the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element of the project.
(e) Special rule for projects receiving funds for post-authorization study.—A project or separable element of a project may not be identified on the interim deauthorization list developed under subsection (b), or the final deauthorization list developed under subsection (c), if the project or separable element received funding for a post-authorization study during the current fiscal year or any of the 6 preceding fiscal years.
(f) General provisions.—
(1) DEFINITIONS.—In this section, the following definitions apply:
(A) POST-AUTHORIZATION STUDY.—The term “post-authorization study” means—
(i) a feasibility report developed under section 905 of the Water Resources Development Act of 1986 (33 U.S.C. 2282);
(ii) a feasibility study, as defined in section 105(d) of the Water Resources Development Act of 1986 (33 U.S.C. 2215(d)); or
(iii) a review conducted under section 216 of the Flood Control Act of 1970 (33 U.S.C. 549a), including an initial appraisal that—
(2) TREATMENT OF PROJECT MODIFICATIONS.—For purposes of this section, if an authorized water resources development project or separable element of the project has been modified by an Act of Congress, the date of the authorization of the project or separable element shall be deemed to be the date of the most recent modification.
(a) Project deauthorization.—
(1) IN GENERAL.—A water resources development project, or separable element of such a project, authorized for construction by this Act shall not be authorized after the last day of the 10-year period beginning on the date of enactment of this Act unless—
(2) IDENTIFICATION OF PROJECTS.—Not later than 60 days after the expiration of the 10-year period referred to in paragraph (1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that identifies the projects deauthorized under paragraph (1).
(b) Report to Congress.—Not later than 60 days after the expiration of the 12-year period beginning on the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives, and make available to the public, a report that contains—
(c) Clarification.—Section 6003(a) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 579c(a)) is amended by striking “7-year” each place it appears and inserting “10-year”.
(a) Consistency with reports.—Congress finds that the project modifications described in this section are in accordance with the reports submitted to Congress by the Secretary under section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d), titled “Report to Congress on Future Water Resources Development”, or have otherwise been reviewed by Congress.
The portion of the project for navigation, Milwaukee Harbor, Milwaukee, Wisconsin, authorized by the first section of the Act of March 3, 1843 (5 Stat. 619; chapter 85), consisting of the navigation channel within the Menomonee River that extends from the 16th Street Bridge upstream to the upper limit of the authorized navigation channel and described as follows is no longer authorized beginning on the date of enactment of this Act:
(1) Beginning at a point in the channel just downstream of the 16th Street Bridge, N383219.703, E2521152.527.
(2) Thence running westerly along the channel about 2,530.2 feet to a point, N383161.314, E2518620.712.
(3) Thence running westerly by southwesterly along the channel about 591.7 feet to a point at the upstream limit of the existing project, N383080.126, E2518036.371.
(4) Thence running northerly along the upstream limit of the existing project about 80.5 feet to a point, N383159.359, E2518025.363.
(5) Thence running easterly by northeasterly along the channel about 551.2 feet to a point, N383235.185, E2518571.108.
That portion of the project for navigation, Bridgeport Harbor, Connecticut, authorized by the Act of June 18, 1878 (20 Stat. 158), and modified by the Act of August 11, 1888 (25 Stat. 401), the Act of March 3, 1899 (30 Stat. 1122), the Act of June 25, 1910 (36 Stat. 633), and the Act of July 3, 1930 (46 Stat. 919), and lying upstream of a line commencing at point N627942.09, E879709.18 thence running southwesterly about 125 feet to a point N627832.03, E879649.91 is no longer authorized beginning on the date of enactment of this Act.
(a) Cheatham County, Tennessee.—
(1) CONVEYANCE AUTHORIZED.—The Secretary may convey to Cheatham County, Tennessee (in this subsection referred to as the “Grantee”), all right, title, and interest of the United States in and to the real property in Cheatham County, Tennessee, consisting of approximately 9.19 acres, identified as portions of tracts E–514–1, E–514–2, E–518–1, E–518–2, E–519–1, E–537–1, and E–538, all being part of the Cheatham Lock and Dam project at CRM 158.5, including any improvements thereon.
(2) DEED.—The conveyance of property under this subsection shall be accomplished using a quitclaim deed and upon such terms and conditions as the Secretary determines appropriate to protect the interests of the United States, to include retaining the right to inundate with water any land transferred under this subsection.
(b) Nashville, Tennessee.—
(1) CONVEYANCE AUTHORIZED.—The Secretary may convey, without consideration, to the City of Nashville, Tennessee (in this subsection referred to as the “City”), all right, title, and interest of the United States in and to the real property covered by Lease No. DACW62–1–84–149, including any improvements thereon, at the Riverfront Park Recreational Development, consisting of approximately 5 acres, subject to the right of the Secretary to retain any required easements in the property.
(2) CONVEYANCE AGREEMENT.—A quit claim deed shall be used to convey real property under this subsection upon the terms and conditions mutually satisfactory to the Secretary and the City. The deed shall provide that in the event the City, its successors, or assigns cease to maintain improvements for recreation included in the conveyance or otherwise utilize the real property conveyed for purposes other than recreation and compatible flood risk management, the City, its successor, or assign shall repay to the United States the Federal share of the cost of constructing the improvements for recreation under the agreement between the United States and the City dated December 8, 1981, increased as necessary to account for inflation.
(c) Generally applicable provisions.—
(1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—The exact acreage and the legal description of any real property to be conveyed under this section shall be determined by a survey that is satisfactory to the Secretary.
(2) APPLICABILITY OF PROPERTY SCREENING PROVISIONS.—Section 2696 of title 10, United States Code, shall not apply to any conveyance under this section.
(3) ADDITIONAL TERMS AND CONDITIONS.—The Secretary may require that any conveyance under this section be subject to such additional terms and conditions as the Secretary considers necessary and appropriate to protect the interests of the United States.
(4) COSTS OF CONVEYANCE.—An entity to which a conveyance is made under this section shall be responsible for all reasonable and necessary costs, including real estate transaction and environmental documentation costs, associated with the conveyance.
(5) LIABILITY.—An entity to which a conveyance is made under this section shall hold the United States harmless from any liability with respect to activities carried out, on or after the date of the conveyance, on real property conveyed. The United States shall remain responsible for any liability with respect to activities carried out, before such date, on the real property conveyed.
The portions of the project for raising and improving existing levees of Clatsop County Diking District No. 13, in Clatsop County, Oregon, authorized by section 5 of the Act of June 22, 1936 (49 Stat. 1590), that are referred to as Christensen No. 1 Dike No. 42 and Christensen No. 2 Levee No. 43 are no longer authorized beginning on the date of enactment of this Act.
Subject to a determination by the Secretary that the costs are reasonable and allowable and that the work for which credit is requested was carried out in accordance with the laws specified in section 5014(i)(2)(A) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1331) and all other applicable Federal laws, the Secretary may credit toward the non-Federal share of the cost of the Kissimmee River project, authorized in section 101(8) of the Water Resources Development Act of 1992 (106 Stat. 4802), the value of in-kind contributions made by the non-Federal interest with respect to the six following actions, as described in the final report of the Director of Civil Works on the Central and Southern Florida Project, Kissimmee River Restoration Project, dated April 27, 2018:
That portion of the channel improvement project, Lytle and Cajon Creeks, California, authorized to be carried out as a part of the project for the Santa Ana River Basin, California, by the Act of December 22, 1944 (Chapter 665; 58 Stat. 900) that consists of five earth-filled groins commonly referred to as “the Riverside Avenue groins” is no longer authorized as a Federal project beginning on the date of enactment of this Act.
(a) In general.—The project for flood damage reduction, Yuba River Basin, California, authorized by section 101(a)(10) of the Water Resources Development Act of 1999 (113 Stat. 275) is modified to allow a non-Federal interest to construct a new levee to connect the existing levee with high ground.
(b) Project description.—The levee to be constructed shall tie into the existing levee at a point Northing 2186189.2438, Easting 6703908.8657, thence running east and south along a path to be determined to a point Northing 2187849.4328, Easting 6719262.0164.
(c) Cooperation agreement.—The Secretary shall execute a conforming amendment to the Memorandum of Understanding Respecting the Sacramento River Flood Control Project with the State of California dated November 30, 1953, that is limited to changing the description of the project to reflect the modification.
(d) No Federal cost.—
(1) REVIEW COSTS.—Before construction of the levee described in subsection (b), the Secretary may accept and expend funds received from a non-Federal interest to review the planning, engineering, and design of the levee described in subsection (b) to ensure that such planning, engineering, and design complies with Federal standards.
The following projects for water resources development and conservation and other purposes, as identified in the reports titled “Report to Congress on Future Water Resources Development” submitted to Congress on March 17, 2017, and February 5, 2018, respectively, pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed by Congress are authorized to be carried out by the Secretary substantially in accordance with the plans, and subject to the conditions, described in the respective reports or decision documents designated in this section:
(1) NAVIGATION.—
A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
1. TX | Galveston Harbor Channel Extension Project, Houston-Galveston Navigation Channels | Aug. 8, 2017 | Federal: $10,046,000Non-Federal: $3,349,000Total: $13,395,000 |
(2) FLOOD RISK MANAGEMENT.—
A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
1. NY | Mamaroneck-Sheldrake Rivers | Dec. 14, 2017 | Federal: $53,500,000Non-Federal: $28,750,000Total: $82,250,000 |
2. HI | Ala Wai Canal | Dec. 21, 2017 | Federal: $198,962,000; Non-Federal: $107,133,000Total: $306,095,000 |
(3) HURRICANE AND STORM DAMAGE RISK REDUCTION.—
A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Initial Costs and Estimated Renourishment Costs |
1. FL | St. Johns County | Aug. 8, 2017 | Initial Federal: $5,712,000 Initial Non-Federal: $19,122,000Initial Total: $24,834,000 Renourishment Federal: $9,484,000Renourishment Non-Federal: $44,099,000Renourishment Total: $53,583,000 |
2. TX | Sabine Pass to Galveston Bay | Dec. 7, 2017 | Initial Federal: $2,157,202,000 Initial Non-Federal: $1,161,570,000 Initial Total: $3,318,772,000 |
3. FL | St. Lucie County | Dec. 15, 2017 | Initial Federal: $7,097,000Initial Non-Federal: $13,179,000 Initial Total: $20,276,000 Renourishment Federal: $8,915,000Renourishment Non-Federal: $24,105,000Renourishment Total: $33,020,000 |
(4) FLOOD RISK MANAGEMENT AND ECOSYSTEM RESTORATION.—
A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
1. NM | Española Valley, Rio Grande | May 11, 2018 | Federal: $40,117,000Non-Federal: $21,601,000Total: $61,718,000 |
(5) MODIFICATIONS AND OTHER PROJECTS.—
A. State | B. Name | C. Date of DecisionDocument | D. Estimated Costs |
1. GA | Savannah Harbor Expansion Project | Dec. 5, 2016 | Federal: $677,613,600Non-Federal: $295,829,400Total: $973,443,000 |
2. KY | Kentucky River Locks and Dams - 1, 2, 3, and 4 | April 20, 2018 | Federal: $0Non-Federal: $0Total: $0 |
Union Calendar No. 548 | |||||
| |||||
[Report No. 115–708] | |||||
A BILL | |||||
To provide for improvements to the rivers and harbors of the United States, to provide for the
conservation and development of water and related resources, and for other
purposes. | |||||
June 1, 2018 | |||||
Reported with an amendment, committed to the Committee of the Whole House on the State of the
Union, and ordered to be printed |